The tip of the steel pipe pile is driven into the supporting layer! It is suitable when there is a layer of weak ground more than 1.5m under the building.
The "Steel Pipe Pile Driving Method" is a settlement correction method used when there is a layer of weak ground beneath a building that is more than 1.5 meters deep. The tip of the steel pipe pile is driven into the supporting layer. By correcting the building to a stable foundation, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ 10-year warranty ■ Suitable when there is a layer of weak ground beneath the building that is more than 1.5 meters deep ■ The tip of the steel pipe pile is driven into the supporting layer ■ Reduces earthquake damage by correcting the building to a stable foundation ■ Restores a comfortable and safe living environment by jacking up and leveling the building's tilt *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Flow of the Construction Process】 ■Consultation via phone ↓ ■On-site survey ↓ ■Soil investigation and level measurement ↓ ■Design and estimate *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■ There is a layer of soft ground under the building that is 1.5m or more. *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Apple House Co., Ltd., we carry out subsidence correction work, bridge inspection services, as well as ground surveys, land development, and interior and exterior renovation work. From Kyushu to Hokkaido, we repair buildings across the country that have tilted due to various causes such as earthquakes, ground subsidence, and construction defects, and we propose methods tailored to the current ground conditions.