Create improved ground from the support layer to take reaction forces! Suitable when the layer of weak ground under the building is less than 1.5m.
The "Pressure-resistant slab method" is a settlement correction method used when there is a layer of weak ground less than 1.5 meters beneath a building. It creates improved ground from the supporting layer to take reaction force. By correcting the building to a solid ground, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable when there is a layer of weak ground less than 1.5 meters beneath the building ■ Creates improved ground from the supporting layer to take reaction force ■ Reduces earthquake damage by correcting the building to a solid ground ■ Jacks up the building to level it and restores a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Flow until construction】 ■Consultation by phone ↓ ■On-site survey ↓ ■Soil investigation and level measurement ↓ ■Design and estimate *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Soft ground layer under the building is less than 1.5m *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Apple House Co., Ltd., we carry out subsidence correction work, bridge inspection services, as well as ground surveys, land development, and interior and exterior renovation work. From Kyushu to Hokkaido, we repair buildings across the country that have tilted due to various causes such as earthquakes, ground subsidence, and construction defects, and we propose methods tailored to the current ground conditions.