Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

2326~2340 item / All 4237 items

Displayed results

[Road Widening Method] Wide Wall Method

1.5-lane road improvement response - roadway widening system

【NETIS SK-050012-A】 It is possible to widen the road by about 2 meters simultaneously with the construction of conventional block stacking. It is ideal for one-lane roads in mountainous areas, allowing for the installation of vehicle pull-off areas (1.5-lane conversion), sidewalks, bus stops, etc. Additionally, stacking up to four layers allows the internal space of the blocks to be used for nesting and watering areas for wild birds and small animals, making it an environmentally friendly product that coexists with nature.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ECO-nbi construction method

Ecological (eco) & Economical (economic)

【NETIS HR-120004-A】 By combining the primary and secondary lids, we effectively utilize the existing drainage channel body and rejuvenate it like a newly constructed drainage channel. No special construction machinery is required, and manual construction is possible. For small-scale projects, construction can be completed in about half a day. This method is perfect for the era of maintenance management and longevity.

  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multi-slide method

Installation method for products at sites where large vehicles and heavy machinery cannot enter.

【NETIS CB-060014-A】 This is a construction method for installing secondary products such as box culverts, free gradient ditches, and L-shaped retaining walls in mountainous areas and urban areas where large vehicles and heavy machinery cannot enter. It involves installing rails (steel materials) and steel balls, over which products mounted on sleds (steel materials) slide. Manual installation is also possible depending on the weight of the products.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco waterway construction method

Fish habitat functional environmental waterway

The "Eco Waterway Construction Method" is a new ecological conservation waterway construction method developed with the aim of improving functionality while reducing costs. There are three types: bottom hole type, horizontal hole type, and combined type.

  • Erosion control works
  • Agricultural civil engineering works
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Toris method

A construction method that provides safe breeding sites (nesting) for kingfishers and crested kingfishers.

"From Concrete to Birds" Kingfishers dig their own holes in exposed vertical banks and cliffs to build nests. However, in recent years, suitable nesting locations have become very scarce nationwide. Therefore, this method provides a safe breeding place (nesting) for kingfishers and crested kingfishers through newly constructed precast concrete retaining walls.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed block

Earth-friendly weed prevention function that stops the growth of weeds themselves.

Using the phototropic property that plants inherently possess, which is "buds do not grow downward," we have integrated paving material into the diagonal cut on the product's side, forcing the budding shoots to grow downward, thereby preventing the growth of weeds.

  • Secondary paving products
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rockfall prevention construction method "Stronger Method" *Construction case examples available

Utilizing existing rockfall protection fences! Achieving both short construction periods and low costs without the need for special equipment. Proven results in railways and other applications.

The "Stronger Method" is a rockfall countermeasure technique that allows for reinforcement and heightening of existing rockfall protection fences without processing or dismantling them. No special equipment or skills are required, and it can be completed in just a few days. It enhances rockfall capture performance with "short construction periods and low costs." It is compatible with H-beam type protection fences and has been widely adopted in railways and highways. Currently, we are offering a collection of case studies for construction near railways. 【Features】 ■ Construction costs are lower compared to new installation of protection fences ■ Can be constructed without special equipment such as heavy machinery ■ Short construction periods allow for brief traffic restrictions ■ Achieved reinforcement of approximately 30 meters of protection fence in 3 days ■ NETIS registered method (Number: HR-140004-A) *Catalogs and case study collections can be viewed via "PDF Download."

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Stronger Method Adoption Example] Replacement of Bent Columns

The construction period is one day! The cost is less than half compared to base plate type or when demolishing and rebuilding.

Our company offers a rockfall protection fence reinforcement method called "Stronger Method," which allows for the reuse of bent posts by utilizing existing structures. First, remove the wire attachment fittings and cut the post at the base (250mm from the top). Then, attach the post connection member (only bolted). Next, install the raised post and reattach the removed wire attachment fittings. Compared to base plate systems or complete demolition and new installation, the cost is less than half, and the construction period can be completed in one day. [Example of Adoption] ■ Location: Yamanashi Prefecture ■ Type: Raised type ■ Work Procedure 1. Remove the wire attachment fittings and cut the post at the base (250mm from the top). 2. Attach the post connection member (only bolted). 3. Install the raised post and reattach the removed wire attachment fittings. *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.jpg
  • image_04.jpg
  • image_03.jpg
  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shizuoka Prefecture construction case study: Reinforcement method for existing rockfall protection fences - Noise control measures during demolition!

Noise, dust, and high alkaline water treatment measures during demolition are not required. It is a simple construction method.

Here is a case study of the "Stronger Method" implemented in Shizuoka Prefecture. As a result of the construction, the fence height increased from 1.5m to 2.0m, with a construction length of L = 30.0m. This method connects the tops of the posts with steel rods, allowing the load that was previously supported by a single span to be distributed across multiple spans. Additionally, in areas where there are concerns about insufficient fence height, height-raising materials can be used to increase the fence height. [Case Study] ■Height-raising type (Fence height: H = 1.5 → 2.0m, Construction length: L = 30.0m) ■Shizuoka Prefecture (Construction: Fiscal Year 2018) *For more details, please refer to the PDF document or feel free to contact us.

  • Protective fence

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NETIS registered - Repair work for access prevention fence 'DON'T DIG method'

Renewal of the old access prevention fence! Utilizing existing posts, reducing construction time by over 50%.

The "DON'T DIG Method" allows for the installation of new poles without excavation by cutting and reusing part of the existing poles. It can be installed without being affected by the roots of trees and other vegetation in mountainous areas, and it does not generate industrial waste. It accommodates various pole shapes and does not require archaeological surveys for buried cultural properties. Additionally, since no digging is involved, it does not damage buried cables. 【Features】 ■ Utilizes existing poles for construction ■ Shorter construction period due to no excavation ■ No industrial waste generated ■ Not affected by the roots of trees and other vegetation ■ Compatible with various pole shapes *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Twin Ray Method

Twin Ray Method

A hybrid pavement construction method called Twin Ray Method, which combines two types of asphalt mixtures with different properties to create a two-layer structure that maximizes the functionality of each layer. 【Features】 ○ Utilizes Multi Asphalt Paver (MAP) that allows for simultaneous construction of two layers. ○ Characterized by cost reduction through efficient paving, integration of structure, and thinning of the constituent layers. ○ Representative examples of this method include the Permi Twin Method, Thin Layer Permi Pavement Method, New Wabbit Method, and Color Pavement Twin Ray Method. ● For other functions and details, please contact us.

  • Dam construction
  • Paving of sidewalks, roads, parking lots and stadiums
  • Pavement construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pavement Refresh Repair Method "CAM Seal NEO"

It is possible to fill in the depressions in the damaged pavement and refresh the surface.

CAM Seal NEO is a mortar-like material composed of cement and asphalt emulsion, used as a repair method to fill depressions in deteriorated pavement surfaces and refresh them. CAM Seal NEO is a room temperature curing type that is highly safe, and after curing, it offers a more aesthetically pleasing appearance and greater wear resistance compared to conventional products. 【Features】 - Fills depressions in rough pavement and refreshes the surface. - The material cures at room temperature, ensuring high safety during handling. - Can be easily applied without the need for specialized tools, using a hand mixer and rubber rake. - Offers a more attractive appearance and greater wear resistance after application compared to traditional cement-based repair materials. For more details, please contact us or download the catalog.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asphalt solvent-based bridge deck paving adhesive "Civil Star"

Special solvent-based adhesive with excellent adhesion and elasticity.

Civil Star is a solvent-based adhesive developed for steel and concrete floor slabs, made by mixing special rubber and special resins.

  • Paving of sidewalks, roads, parking lots and stadiums
  • Paving Materials
  • Bridge Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration