List of Civil Engineering products
- classification:Civil Engineering
676~720 item / All 8138 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
【2024/10/07 Acquired VE Evaluation】A specialized weather service that can be used for heavy rain measures, strong wind measures, worker safety, and project management.
- River construction
"Point Weather Forecast" KIYOMASA PRO has obtained "VE Evaluation"!
The weather risk management mobile "KIYOMASA PRO" has received the highest rank VE evaluation (proven effective technology) in NETIS (New Technology Information System of the Ministry of Land, Infrastructure, Transport and Tourism). NETIS Number: KT-230016-VE Technology Name: Weather Risk Management Mobile "KIYOMASA PRO" ◆ Benefits of VE Evaluation 1. Additional points for technical proposals and creativity in construction performance evaluation It is expected that evaluation points will improve during technical proposal submissions for bidding and at the completion of construction (construction performance evaluation). This increases competitiveness compared to using other weather information services, and further recognition from clients and contractors is anticipated. 2. Simplification of procedures Typically, the creation and submission of the "Effectiveness Survey Form," which is required within 30 days after construction completion, will not be necessary, simplifying post-construction procedures. 3. Long-term availability The VE evaluation obtained this time is scheduled to be published for 10 years starting from the year following the initial registration (2024). It can be used over a long period, providing peace of mind. Above all, it is recognized as a superior technology compared to conventional methods, offering tremendous effectiveness as a weather risk management tool to protect sites and workers from localized heavy rain, lightning, and gusts.
It can be used to address surrounding environmental measures and reduce watering costs!
- Dismantling and moving
Quickly modifiable in a short time! Liquid-type excavation soil improvement and solidification agent that does not affect soil pH.
- Other civil engineering works
- Subsidiary materials
A material that reduces chamber pressure during the excavation of cohesive soil and is also highly effective in preventing adhesion.
- Earthworks
Liquid-type adhesion prevention agent to prevent clay adhesion to the blade edge and cutting edge during excavation of cohesive soil!
- Earthworks
Protecting against floods using air! Next-generation emergency flood protection system as an alternative to sandbags: flood barriers and water-stopping boards.
- Safety and consumables
- Other civil engineering works
- Other civil engineering services
Introducing the history of NOAQ, the manufacturer of the stopwater board Boxwall.
The box wall was introduced to the market in 2007. Since then, it has a proven track record of protecting against floods worldwide.
Adopted for the purpose of protecting granite soil slopes, which are easily erosed. A case of protecting the slopes around the sediment control dam.
- Erosion control works
- Slope protection material
- Civil Engineering Method
Utilization plan for technical proposals: Rainfall measures in dam construction.
- Dam construction
A site with no obstructions nearby, where strong winds and sudden heavy rain are a concern; sharing information along with digital signage.
- Other civil engineering works
- Bridge Construction
- Weather Survey
【ZEROSAI Introduction Case】 Prefectural Government 〇〇 Bridge Superstructure Construction Site Concerned about strong winds and sudden heavy rain with no obstructions nearby. Sharing information in conjunction with digital signage. Utilizing ICT to achieve weather DX!
We will introduce a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There are no barriers around the site, so strong wind measures must be implemented with a sense of urgency during work. - Accurate judgment of work feasibility is necessary for effective project management. - We also want to enhance the image among local residents. 【Operations to Solve Challenges】 For more details, please download the PDF.
Since we can create order drawings in 3D, it is possible to have visually clear meetings using 3D drawings!
- Bridge Construction
- Bridge Materials
Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together!
- Other civil engineering works
- Road construction
- Earthworks
[ZEROSAI Case Study] Private Company - Solar Power Plant Construction Project. Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together! Achieving weather digital transformation (DX) using ICT!
Introducing a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There is a distance from the site office to the actual site, requiring personnel to move to confirm the site conditions. - During earthworks, it is necessary to be cautious of the flow of soil, so accurate understanding of weather conditions is essential. 【Operations to Solve the Challenges】 Please download the PDF for more details.
Cloud management of weather information automatically triggers alarms to ensure safety.
- Road construction
[Examples of Technical Proposal Utilization] ○○ Line Road Improvement Project Clarification of Work Suspension Criteria Automatic Alarm Activation for Safety Assurance Rainfall Measures Guerrilla Rainstorms ICT DX Remote Monitoring Guerrilla Rainstorms Electronic Display Boards Technical Proposals Creativity and Innovation
■On-site Issues: Focus Points in Evaluation During the construction period, sudden weather changes such as guerrilla rainstorms unique to mountainous areas are anticipated. These can lead to delays in various processes and a decline in quality, requiring extensive discussions for improvement, which in turn leads to further delays. For more details, please visit our company website or product release information. https://product.sysmet.jp/exercise/k_131.html
Beach nourishment project on the coast facing the Sea of Japan.
- Harbor Construction
- IoT
We will carry out piping design for open-cut and non-open-cut construction using steel pipes, as well as water pipe bridge design.
- Bridge Construction
We will carry out piping design for medium to high pressure gas pipelines (buried, pushed, attached, and dedicated bridges).
- Pipeline Construction
Regarding civil engineering design, we provide comprehensive support from drafting to meetings, discussions with government agencies, reviews, calculations, quantity takeoffs, and cost estimation.
- Pipeline Construction
We would like to introduce the Neplus method "Slit Type," recommended for roadside ditches and similar applications.
- Paving of sidewalks, roads, parking lots and stadiums
This is an introduction to the "Soundproof Type" Neplus method suitable for noise prevention in side ditches.
- Paving of sidewalks, roads, parking lots and stadiums
【※Looking for construction partners!】 The Neplus method is a technique that repairs only the upper part of damaged gutters! Cost reduction, resource and energy conservation, and shortened construction...
- Earthworks
This is an introduction to two types of the Neplus method "circular drainage ditch compatible type" for longitudinal and transverse use.
- Paving of sidewalks, roads, parking lots and stadiums
Introducing two types of the Neplus method: "Cross Type" and "Angle Type."
- Paving of sidewalks, roads, parking lots and stadiums
The Neplus method "Buried Type" allows for drawing white lines without interfering with the design of the sidewalk by embedding everything except for the grating part.
- Paving of sidewalks, roads, parking lots and stadiums
Free gift! A collection of examples for the utilization and installation of durable stainless steel drainage pipes and drainage pits.
- Bridge Construction
Ultrasonic flow meter capable of measuring slurry, muddy water, and bubble-containing liquids.
- Airport facilities
Perfect for airport rental car reception! A hotline that allows you to talk to staff immediately with easy operation!
- Airport facilities
- Headquarters/Store System
- Other commercial buildings and service facilities
The addition of reflective material to the side of the bag has improved visibility during reflection.
- Road construction
- Car and bicycle parking facilities
"Anchor plates" are end fittings for PC steel wires and PC steel bars.
- Reinforced concrete construction
Reinforcement rebar around the steel rod stopper at the pier support section of the spiral muscle.
- Reinforced concrete construction
The materials are lightweight, making placement and construction easy! Soil-cement filling is adopted, allowing for proper restoration.
- Other earthworks, foundation works, and exterior floors
A construction method that allows for small teams and short-duration work, enabling shortened construction periods and cost reductions!
- Other earthworks, foundation works, and exterior floors
A construction method that can be carried out without using large machinery! Technology for manufacturing root stabilization blocks on-site.
- River construction
Net field driftwood stop
- Watergate
- Tunnel construction
- Airport facilities
Surface water intake device
- Tunnel construction
- Airport facilities
- Other civil engineering works
Deep Aeration Circulation Facility
- Other civil engineering works
Shallow and full-layer aeration circulation facility
- Other civil engineering works
Ecological vegetative floating islands are created by planting aquatic plants on a buoyant vegetative substrate, artificially generating floating islands.
- Garden stones, sculptures, fountains, ponds
- Airport facilities
- Other civil engineering works
This is an automatic boat passage gate that adopts a level crossing type door opening and closing mechanism.
- Tunnel construction
- Airport facilities
- River construction
Towable self-sinking anchor
- Other civil engineering works
- Crane and others