This is an introduction to the "Soundproof Type" Neplus method suitable for noise prevention in side ditches.
The Neplus method "Soundproof Type" is suitable for locations where stores or residences are adjacent to drainage ditches and excavation cannot be performed, or where excavation cannot be done at parking lot entrances or retaining walls. By using the soundproof type, noise such as rattling sounds can be prevented. In conventional methods, the work takes 4 to 5 days, but the Neplus method can be completed in one day, making it safe to use even in stores, residences, and busy parking lots. 【Comparison with Conventional Methods】 ● Conventional Method Survey → Temporary Closure → Pavement Slab Crushing → Mechanical Excavation → Foundation Work → Drainage Ditch Installation → Pavement Restoration → Completion - Days: 4-5 days - Asphalt Waste: 0.30 m² - Excavated Soil Volume: 30.5 m² - Concrete Waste: 0.87 m² ● Neplus Method Survey → Cutting → Installation of Renovation Products → Backfilling Material → Installation of Cover Plate → Completion - Days: 1 day - Asphalt Waste: 0 m² - Excavated Soil Volume: 0 m² - Concrete Waste: 0.17 m² *For more details, please contact us or download the PDF materials for review.
Inquire About This Product
basic information
【Specification Table】 ●Soundproof Type (Main Unit) Name / Dimension Table (mm) A・W・a1・d・E・H・T・B / Reference Weight (Kg) - For 300 / A300・W480・a1 380・d50・E90・H130・T97・B390 / 186 - For 400 / A400・W590・a1 480・d55・E95・H145・T112・B500 / 248 - For 500 / A500・W710・a1 590・d60・E105・H160・T127・B620 / 323 - For 600 / A600・W820・a1 700・d60・E110・H180・T147・B730 / 411 Additionally, there are specification tables for lids and grating lids. *For more details, please contact us or download the PDF document to view.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us or download and view the PDF materials.
catalog(1)
Download All CatalogsCompany information
The Neplus Method National Association is an organization that promotes the expansion of the "Neplus Method" for the repair of the upper part of drainage ditches, provides technical support, manufactures and supplies products, and offers technical assistance to construction partners. The Neplus Method involves removing only the damaged upper part of the drainage ditch with a specialized cutting machine and installing new repair products to renew the ditch. The construction period is quick, allowing for immediate traffic reopening if about 10 meters are completed in a day. Additionally, it can be easily implemented even in ditches close to structures or underground installations without the need for excavation. We have handled numerous drainage repair projects to date. If you have any issues with drainage work, please feel free to contact us.