List of Civil Engineering products
- classification:Civil Engineering
91~135 item / All 7977 items
You can install scaffolding on the float! Enjoy the water space freely! Information on floating dock rentals.
- Bridge Materials
World brand equipped with SCANIA engine. High-performance DEEP SEA controller adopted. Long-life STANFORD generator installed.
- Power generation facilities

[Pre-Purchase Campaign] You can view actual existing generators. *Limited to those considering purchasing a generator.
Thank you very much for visiting our company website and catalog, and for your interest in our diesel engine generators. From customer surveys, the most common feedback we received was: - I want to see the actual generators that have been installed. - I want to see them operating under real load. - I want to hear the opinions of companies that have installed them. - I want to see the generators in operation before making a purchase. After all, it’s understandable to feel worried about purchasing a generator without seeing the actual unit first, right? As the saying goes, "Seeing is believing," so we will be holding this tour. It will take place in that area of the Kanto region, where summer temperatures exceed 40°C. We successfully operated our generators this summer as well, so we are confident in handling the heat (sweat). Additionally, it has been confirmed that our generators equipped with the world-leading "Scania engine" are "fuel-efficient." This will surely help reduce daily operating costs. Please note that while we will provide kind and courteous assistance, the meeting and dispersal will be at the site (transportation costs and other expenses will be borne by the customer), so please understand this in advance. Contact: Kaneko
A construction method that involves cutting and repairing only the upper part of a damaged drainage ditch! It brings numerous benefits such as cost reduction, resource and energy conservation, and sho...
- Earthworks
Cloud management of water level information combined with weather forecasts without the need for a power supply.
- River construction
- Weather Survey
- Measurement and analysis equipment leasing and rental

Three-color indicator light: Convenient usage techniques in conjunction with battery-operated water level gauge.
We would like to introduce convenient ways to utilize the newly released product, the "Three-Color Indicator Light," which was developed based on feedback from everyone. The "Three-Color Indicator Light" can be combined with a "Battery-Powered Water Level Gauge" to sound alarms based on segmented water level observations. Usage Examples: Monitor water level observations in three stages and take appropriate actions according to the level. Detect the risk of rapid water level rise during rainfall and take early preventive actions to ensure safety. - Set the baseline water level of 2m as Level 1: The green indicator light rotates, indicating standby. - Set the baseline water level of 4m as Level 2: The yellow indicator light rotates, indicating caution. - Set the baseline water level of 5m as Level 3: The red indicator light rotates, indicating evacuation. Additionally, the "Disaster Prevention Light" can display messages for workers and community members on a daily basis. Raising awareness of safety measures at the site is crucial through consistent practices such as daily KY (Kiken Yochi, or hazard prediction) and pointing out dangerous areas and points of caution. Let’s continuously display what to be cautious about during this season and strive to improve safety awareness across the entire site. Please feel free to utilize this for safety measures at the site, as well as for technical proposals and creative ideas. *For more details, please refer to the PDF document or feel free to contact us.
Centralized management of weather forecasts and on-site water levels in the cloud! Automatic notifications via electronic display boards and business chat during emergencies.
- River construction
- Weather Survey

Three-color indicator light: Convenient usage techniques in conjunction with battery-operated water level gauge.
We would like to introduce convenient ways to utilize the newly released product, the "Three-Color Indicator Light," which was developed based on feedback from everyone. The "Three-Color Indicator Light" can be combined with a "Battery-Powered Water Level Gauge" to sound alarms based on segmented water level observations. Usage Examples: Monitor water level observations in three stages and take appropriate actions according to the level. Detect the risk of rapid water level rise during rainfall and take early preventive actions to ensure safety. - Set the baseline water level of 2m as Level 1: The green indicator light rotates, indicating standby. - Set the baseline water level of 4m as Level 2: The yellow indicator light rotates, indicating caution. - Set the baseline water level of 5m as Level 3: The red indicator light rotates, indicating evacuation. Additionally, the "Disaster Prevention Light" can display messages for workers and community members on a daily basis. Raising awareness of safety measures at the site is crucial through consistent practices such as daily KY (Kiken Yochi, or hazard prediction) and pointing out dangerous areas and points of caution. Let’s continuously display what to be cautious about during this season and strive to improve safety awareness across the entire site. Please feel free to utilize this for safety measures at the site, as well as for technical proposals and creative ideas. *For more details, please refer to the PDF document or feel free to contact us.
Design change request to the client based on the data observed from the digital jellyfish.
- Harbor Construction
- Weather Survey

[Feature Introduction] Digital Jellyfish Observation Data Output Function
We would like to introduce the convenient features of the small wave height observation device, Digi-Jellyfish, NETIS registration number QSK-170002-VE. It can be utilized not only for safety measures but also for creative ideas and technical proposals. The Digi-Jellyfish is a compact, lightweight, and low-cost device that enables high-precision observations of wave heights. The observed data can be checked in real-time on the Compass PLUS website. The data collected by the Digi-Jellyfish is stored on a server, allowing for the output of past observation data in PDF and CSV formats. 【Operating Environment】 - The point most affected by waves and swells within the construction area - Trial construction with a risk assessment for severe weather *For more details, please visit our website or feel free to contact us.
Centralized management of weather forecast information for the site and upstream rivers in the cloud, with automatic notifications via electronic bulletin boards and business chat during emergencies.
- River construction
- Weather Survey
Centralized management of oceanographic information such as wave height and wind speed in the cloud! For safety measures and project management in port construction and maritime transportation.
- Harbor Construction
- Airport facilities
- Coastal construction

September to November: Three-month forecast announced by the Meteorological Agency. The lingering heat is persistent, and autumn arrives quickly.
On August 19th (Tuesday), the Japan Meteorological Agency announced the three-month forecast from September to November. During this period, the upper-level westerlies are expected to flow more to the north than usual, and the Tibetan high-pressure system is anticipated to be stronger and positioned further north than average. *For more details, please visit our website or feel free to contact us.*
A site with no obstructions nearby, where strong winds and sudden heavy rain are a concern; sharing information along with digital signage.
- Other civil engineering works
- Bridge Construction
- Weather Survey

【ZEROSAI Introduction Case】 Prefectural Government 〇〇 Bridge Superstructure Construction Site Concerned about strong winds and sudden heavy rain with no obstructions nearby. Sharing information in conjunction with digital signage. Utilizing ICT to achieve weather DX!
We will introduce a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There are no barriers around the site, so strong wind measures must be implemented with a sense of urgency during work. - Accurate judgment of work feasibility is necessary for effective project management. - We also want to enhance the image among local residents. 【Operations to Solve Challenges】 For more details, please download the PDF.
Utilizing Starlink for cloud management of rainfall and water level information at the construction site of a dam where radio waves cannot connect.
- Erosion control works
- River construction
- Weather Survey
[ZEROSAI Implementation Case] Hakuba Village, Nagano Prefecture, Minamata Work Site - Landslide prevention dam construction with no signal connection, utilizing Starlink to manage on-site rainfall and water level information in the cloud.
【Before Introduction】 In the mountainous area of Hakuba Village, Nagano Prefecture, construction work was hindered by a lack of signal, making it difficult to observe rainfall and water levels. <Challenges> Due to the construction in the mountains, there is a risk of rising water levels from sudden heavy rain. It is necessary to obtain weather information relevant to the site. As a heatstroke prevention measure during the summer, it is necessary to record the heat index (WBGT) and submit it to the client. We have introduced our 【Natural Disaster Prevention System ZEROSAI】 along with 【wireless communication using Starlink】. *For more details, please visit our website or feel free to contact us.
Examples of using weather-resistant large soil bags, fabric formwork for fab reform, and site stabilization work with a comeback!
- Other civil engineering works
Proposal for disaster recovery methods for riverbank protection in earthquake damage!
- Other civil engineering works
Introducing examples of using friction cutter functional coatings!
- Bridge Construction
- Ground foundation construction method
Introducing examples of accident prevention measures for water surface drop incidents in pond bank protection works!
- Other civil engineering works
The disaster prevention steps can be installed at any position in a vertical arrangement, just like stair construction!
- Other civil engineering works
Environmentally focused legal face protection work using a special fabric formwork made from high-strength synthetic fibers combined with planting technology!
- Other civil engineering works
The Volclay mat method can be used for pond renovations aimed at improving seismic resistance through leak prevention!
- Other earthworks, foundation works, and exterior floors
Cracks appeared on the embankment road surface immediately after pulling out the soil anchor! Introducing the causes and proposed countermeasures.
- Piles, caissons, sheet piles
- Ground foundation construction method
Learning from cases where steel arrows could not be removed: estimated causes and proposed countermeasures!
- Piles, caissons, sheet piles
- Ground foundation construction method
Discovered during inspection after the pull-out of the arrow board! Introducing the estimated causes and proposed countermeasure methods.
- Ground foundation construction method
- Bridge Construction
- Piles, caissons, sheet piles
Short fiber non-woven fabric is unsuitable as a sand prevention sheet used for harbor applications!
- Coastal construction
- Ground foundation construction method
Centralized management of on-site sea condition forecasts, weather observation information, and camera footage! Achieving weather digital transformation using ICT!
- Other civil engineering works
- Coastal construction
- Harbor Construction

[Compass PLUS Implementation Case] Hokuriku Regional Development Bureau - Coastal Beach Nourishment Project: Centralized management of sea condition forecasts, weather observation information, and camera footage on-site! Achieving weather digital transformation (DX) using ICT!
We will introduce a case study of the 【Compass PLUS】 (NETIS registration number QSK-210001-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. Field Challenges: Key Points of Evaluation 【Operating Environment】 Install 【N Sensors】 and 【Web Cameras】 on-site to check the sea condition forecasts and weather observation information along with the camera footage within 【Compass PLUS】. Additionally, install a 【Disaster Prevention Light】 above the office to share information with workers on-site. 【Purpose of Implementation】 〇 Understanding weather and sea conditions is essential for construction near the coast. 〇 It allows viewing sea condition forecast information, weather observation information, and camera footage on the same site. 〇 The 【Disaster Prevention Light】 raises awareness of weather disaster prevention among on-site workers. 〇 When adverse weather prevents access to the site, use the 【Web Camera】 to remotely check the site conditions. ■ Proposal (Example) For more details, please download the PDF.
Utilizing rain forecasts for measures against guerrilla heavy rain and linear precipitation zones!
- Retaining wall
- Erosion control works
- Weather Survey

[Example of ZEROSAI Implementation] Regional Development Bureau - River Embankment Protection Work - Managing water levels in three stages to prepare for sudden rises in water levels!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. Challenges on-site: Key focus points for evaluation [Operational Environment] - Install an [N Sensor] near the site to view wind speed predictions and observation data on the cloud. Since there is no power supply at the site, a solar power generation system will be installed. - Install a [battery-operated water level gauge] in the nearby river to monitor water levels. [Purpose of Implementation] - There is a dam upstream, and when sudden torrential rain occurs, the water level rises rapidly, necessitating quick evacuation. - Due to frequent crane operations, project management must ensure that work is conducted on days when wind speed predictions do not exceed the work stoppage threshold of 10 m/s. - Information sharing regarding work stoppages or changes in the schedule must be done swiftly. ■ Proposal (Example) For details, please download the PDF.
Utilizing weather forecast data as materials in meetings also contributes to the skill retention of less experienced staff.
- Road construction
- Weather Survey
- Reinforced concrete construction
[ZEROSAI Introduction Interview] Kumamoto Prefecture, Ogata Construction Co., Ltd. Utilizes weather forecast data as materials in meetings, contributing to the skill retention of less experienced staff.
Issues - It is a bridge substructure site, and multiple concrete placements must be completed reliably; otherwise, we cannot proceed to the next phase. - There are many work processes that are easily affected by weather, such as measures for hot weather concrete placement, and we must coordinate well with partner companies. Key Points for Introduction - Provides weather information tailored to the site in just the necessary amounts, with less unnecessary information compared to other companies, making it user-friendly. - By simply printing the forecast data, it can be immediately utilized as meeting materials and construction documents, leading to improved operational efficiency. *For more details, please refer to the PDF document or feel free to contact us.
Visualizing coastal gusts: Constantly illuminated three-color indicator lights for quick assessment of work feasibility.
- Anemometer
- Weather Survey
- Coastal construction

[ZEROSAI Implementation Case] Regional Development Bureau National Route No. 〇 Road Improvement Project
We will introduce examples of the implementation of the Natural Disaster Prevention System ZEROSAI (Registration Number QS-150021-VE) in civil engineering and construction work in the construction industry. It can be utilized not only for safety measures but also for creative ideas and technical proposals. [Before Implementation] Due to the proximity of the sea and the lack of obstructions, there were many sudden gusts of wind, making it difficult to determine whether it was safe to continue work. <Issues> - Checking weather apps for work decisions took time, and there was a time lag in informing the entire site. - Delays in deciding to halt work due to strong winds led to cases where work continued while risks were present. We introduced our Natural Disaster Prevention System ZEROSAI along with the optional three-color signal light. For more details, please visit our website or download the PDF.
Utilization plan for technical proposals: Rainfall measures in dam construction.
- Dam construction
Quality control of concrete based on weather forecasts! View linear precipitation zones and typhoon information together! Achieving weather digital transformation using ICT!
- Other civil engineering works
- Road construction

【ZEROSAI Case Study】NEXCO Concrete Structure Repair Work Quality Control of Concrete Based on Weather Forecasts! View Linear Precipitation Zones and Typhoon Information Together! Achieving Weather DX with ICT!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - Quality control of concrete is necessary. - Along with temperature management, rainfall prediction and observation are conducted for the management of the concrete pouring process. - Measures need to be taken against sudden strong winds. - Notifications should be sent via LINEWORKS when the standard values are exceeded. ■ Proposal (Example) For details, please download the PDF.
Prevent delays in the important process of concrete pouring with pinpoint forecasts two weeks in advance.
- Bridge Construction

[ZEROSAI Introduction Interview] Akita Prefecture, Japan PS Co., Ltd. Preventing delays in the important process of concrete pouring with pinpoint weather forecasts two weeks in advance.
Issues - Since there is only one ready-mixed concrete manufacturer, it is difficult to change the procurement schedule immediately, and we must make decisions on changing the concrete pouring process early. - When the client requested weather information, we had to retrieve past data from the Japan Meteorological Agency, but often being far from the site made it difficult to determine which information was accurate. Implementation Points - We will proceed with site work leading up to the concrete pouring date, and since forecasts can be viewed two weeks in advance, we can implement measures early. - We can retain weather information that is relevant to the site. Implementation Results *For more details, please refer to the PDF document or feel free to contact us.
Adopted by stores, hotels, and railways! Presenting the track record of a maintenance system that clears the cost and staffing issues associated with wax cleaning to achieve beautiful finishes.
- Other flooring materials
- Other earthworks, foundation works, and exterior floors
- Special flooring/indoor
Prevent deviation of grout material! Gel-like, easy-to-handle liquid admixture for anchor grout material.
- Other civil engineering works
- grout
Introducing a solution-type injection agent that allows for the differentiation between inorganic and organic using the same hardener.
- Other civil engineering works
- Safety and consumables
Properly responding to heavy snowfall! Introducing customer feedback on the wall-mounted gas heat source and electric heater built-in rubber mat used for snow melting.
- Exterior snow melting equipment
Snow melting methods such as 'eaves snow melting' to reduce snow accumulation! We offer various snow melting techniques tailored to your concerns.
- Exterior snow melting equipment

While it is snowing now
Looking back on this winter, even areas that usually have little snow have experienced heavy snowfall, and many people must have faced significant difficulties. The issues caused by snow vary from household to household. Our company offers various snow melting methods tailored to your concerns. If you have any worries or anxieties, please feel free to consult us while it is still snowing "now."
The construction achievements of snow melting equipment exceed 3,500 cases, ranging from single-family homes to public buildings! Snow melting Q&A collection published.
- Exterior snow melting equipment
An example of usage is introduced with a photo! You can check the mechanism, main applications, and suitable conditions, etc.
- Exterior snow melting equipment
We will install stainless steel piping with excellent long-term durability, or SGP piping with excellent rigidity!
- Exterior snow melting equipment