List of Civil Engineering products
- classification:Civil Engineering
676~720 item / All 8139 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
The concept is universal design! We aimed for a pavement that everyone can walk on comfortably.
- Exterior and paving materials <General>
- Paving Materials
- Paving of sidewalks, roads, parking lots and stadiums
Permeable type! Introducing pavement blended with colorfast natural gravel to enhance the color tone.
- Exterior and paving materials <General>
- Paving Materials
- Paving of sidewalks, roads, parking lots and stadiums
Little fading or discoloration! A beautifully designed pavement made with natural aggregates.
- Exterior and paving materials <General>
- Paving Materials
- Paving of sidewalks, roads, parking lots and stadiums
A robust three-dimensional interconnected structure with horizontal and vertical connections! The long-awaited block for heavy vehicles that breaks the conventional wisdom of interlocking blocks.
- Exterior and paving materials <General>
- Paving Materials
- Paving of sidewalks, roads, parking lots and stadiums
Quickly infiltrate and store rainwater on the road surface to prevent puddles and flooding. Reduce the burden on downstream areas through temporary storage.
- Gutters and U-shaped gutters
- Paving of sidewalks, roads, parking lots and stadiums
- Rainwater infiltration facilities
Shorten construction time, reduce labor, and cut costs!
- Drainage and water removal
Shallow soil coverage allows for the installation of short and safe protective fences! Intersection-type flexible continuous foundation.
- Concrete block, ALC panel, extrusion molded cement board construction
- Road construction
The top part is wide, minimizing gaps and eliminating steps! It can accommodate various retaining wall and embankment structures.
- Protective fence
- Road construction
An open adjustment pond that is more economical compared to underground adjustment ponds!
- Flood prevention facilities, fire tanks, and flood control ponds
- Reinforced concrete construction
It allows for significant shortening of construction time without the need for special techniques or skilled workers!
- Reinforced concrete construction
Large cross-sections can be constructed economically, while significantly shortening the construction period!
- Reinforced concrete construction
RoHS2 compliant product! Suitable for irrigation, industrial use, and drainage in civil engineering sites.
- Drainage and water removal
- Drainage and ventilation equipment
The soft part is transparent, allowing for fluid visibility! It is especially suitable for delivery.
- Drainage and water removal
- Drainage and ventilation equipment
For preventing the dispersion of dioxins and asbestos during incinerator dismantling, as well as contaminants during soil purification!
- Large tents and tent warehouses
- Dismantling and moving
Large-diameter and deep drilling is possible! The four-wing excavation pit allows for the construction of an excellent bell-bottom shape.
- Ground foundation construction method
- Civil Engineering Method
- Foundation construction
Cable bundle fastening, also usable as a guide! Available in two sizes for insulation material outer diameters of 18mm to 28mm and 28mm to 38mm.
- Pipeline Construction
Can be stacked like blocks for use! The support height of the pipe can be adjusted as desired.
- Heating and cooling equipment and facilities
- Pipeline Construction
Concrete pins, compatible with gas-powered nail guns! Achieves a dramatic reduction in work hours and shortens construction time.
- Heating and cooling equipment and facilities
- Pipeline Construction
Clean, safe, and stable quality coal ash recycled subgrade material.
- Paving Materials
- Road construction
- Paving of sidewalks, roads, parking lots and stadiums
It can also be used for wide spaces and vertical joints! Please feel free to contact us.
- Paving of sidewalks, roads, parking lots and stadiums
A wide lineup of models with different specifications! This is a rubber joint that can also accommodate wide play areas.
- Paving of sidewalks, roads, parking lots and stadiums
Rubber joint that can also be used for wide play areas! It can be used for vertical joints as well.
- Paving of sidewalks, roads, parking lots and stadiums
Helping to create a city that is friendly to people and nature! Leave your water supply and sewage facility construction to us.
- Other civil engineering services
- Water Supply Facilities
- Sewerage facilities
A pylon developed for use on highways.
- Road construction
- Paving of sidewalks, roads, parking lots and stadiums
- Car and bicycle parking facilities
This is a proposal for the utilization of the disaster prevention system ZEROSAI. Gradual water level alerts and understanding upstream weather information in conjunction with the site.
- River construction
- Weather Survey
Design verification made more reliable and efficient. Joint development with Yachiyo Engineering.
- Site and ground investigation
- Other Software
An LED tape light with excellent strength and waterproofing, capable of expressing a variety of colors (16 colors).
- LED light source/module
- Road construction
- Other lighting fixtures
【2024/10/07 Acquired VE Evaluation】A specialized weather service that can be used for heavy rain measures, strong wind measures, worker safety, and project management.
- River construction
"Point Weather Forecast" KIYOMASA PRO has obtained "VE Evaluation"!
The weather risk management mobile "KIYOMASA PRO" has received the highest rank VE evaluation (proven effective technology) in NETIS (New Technology Information System of the Ministry of Land, Infrastructure, Transport and Tourism). NETIS Number: KT-230016-VE Technology Name: Weather Risk Management Mobile "KIYOMASA PRO" ◆ Benefits of VE Evaluation 1. Additional points for technical proposals and creativity in construction performance evaluation It is expected that evaluation points will improve during technical proposal submissions for bidding and at the completion of construction (construction performance evaluation). This increases competitiveness compared to using other weather information services, and further recognition from clients and contractors is anticipated. 2. Simplification of procedures Typically, the creation and submission of the "Effectiveness Survey Form," which is required within 30 days after construction completion, will not be necessary, simplifying post-construction procedures. 3. Long-term availability The VE evaluation obtained this time is scheduled to be published for 10 years starting from the year following the initial registration (2024). It can be used over a long period, providing peace of mind. Above all, it is recognized as a superior technology compared to conventional methods, offering tremendous effectiveness as a weather risk management tool to protect sites and workers from localized heavy rain, lightning, and gusts.
It can be used to address surrounding environmental measures and reduce watering costs!
- Dismantling and moving
Quickly modifiable in a short time! Liquid-type excavation soil improvement and solidification agent that does not affect soil pH.
- Other civil engineering works
- Subsidiary materials
A material that reduces chamber pressure during the excavation of cohesive soil and is also highly effective in preventing adhesion.
- Earthworks
Liquid-type adhesion prevention agent to prevent clay adhesion to the blade edge and cutting edge during excavation of cohesive soil!
- Earthworks
Protecting against floods using air! Next-generation emergency flood protection system as an alternative to sandbags: flood barriers and water-stopping boards.
- Safety and consumables
- Other civil engineering works
- Other civil engineering services
Introducing the history of NOAQ, the manufacturer of the stopwater board Boxwall.
The box wall was introduced to the market in 2007. Since then, it has a proven track record of protecting against floods worldwide.
Adopted for the purpose of protecting granite soil slopes, which are easily erosed. A case of protecting the slopes around the sediment control dam.
- Erosion control works
- Slope protection material
- Civil Engineering Method
Utilization plan for technical proposals: Rainfall measures in dam construction.
- Dam construction
A site with no obstructions nearby, where strong winds and sudden heavy rain are a concern; sharing information along with digital signage.
- Other civil engineering works
- Bridge Construction
- Weather Survey
【ZEROSAI Introduction Case】 Prefectural Government 〇〇 Bridge Superstructure Construction Site Concerned about strong winds and sudden heavy rain with no obstructions nearby. Sharing information in conjunction with digital signage. Utilizing ICT to achieve weather DX!
We will introduce a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There are no barriers around the site, so strong wind measures must be implemented with a sense of urgency during work. - Accurate judgment of work feasibility is necessary for effective project management. - We also want to enhance the image among local residents. 【Operations to Solve Challenges】 For more details, please download the PDF.
Since we can create order drawings in 3D, it is possible to have visually clear meetings using 3D drawings!
- Bridge Construction
- Bridge Materials
Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together!
- Other civil engineering works
- Road construction
- Earthworks
[ZEROSAI Case Study] Private Company - Solar Power Plant Construction Project. Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together! Achieving weather digital transformation (DX) using ICT!
Introducing a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There is a distance from the site office to the actual site, requiring personnel to move to confirm the site conditions. - During earthworks, it is necessary to be cautious of the flow of soil, so accurate understanding of weather conditions is essential. 【Operations to Solve the Challenges】 Please download the PDF for more details.
Cloud management of weather information automatically triggers alarms to ensure safety.
- Road construction
[Examples of Technical Proposal Utilization] ○○ Line Road Improvement Project Clarification of Work Suspension Criteria Automatic Alarm Activation for Safety Assurance Rainfall Measures Guerrilla Rainstorms ICT DX Remote Monitoring Guerrilla Rainstorms Electronic Display Boards Technical Proposals Creativity and Innovation
■On-site Issues: Focus Points in Evaluation During the construction period, sudden weather changes such as guerrilla rainstorms unique to mountainous areas are anticipated. These can lead to delays in various processes and a decline in quality, requiring extensive discussions for improvement, which in turn leads to further delays. For more details, please visit our company website or product release information. https://product.sysmet.jp/exercise/k_131.html
Beach nourishment project on the coast facing the Sea of Japan.
- Harbor Construction
- IoT
We will carry out piping design for open-cut and non-open-cut construction using steel pipes, as well as water pipe bridge design.
- Bridge Construction