List of Civil Engineering products
- classification:Civil Engineering
586~630 item / All 8139 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Introducing the performance requirements, analysis methods, analysis results, and software used for each case!
- Site and ground investigation
The use of hardening expansive injection material and Dagsim pipes demonstrates the EP effect!
- Earth retaining wall/foundation reinforcement
A construction method that pursues reduced total construction costs and aesthetic appeal: Spar-Tail Arm Method.
- Earthworks
- Pile and foundation work
Harmony with nature, tranquility. Now, Hirose reflects anew.
- Reinforcement and repair materials
- Earthworks
Connect quickly. Connect to the future. The era is all precast.
- Dam construction
- Airport facilities
- Special Construction Method
Economical plans suitable for the site are possible! Panel-assembled large blocks with high adaptability for disaster recovery.
- Aggregates and crushed stone
- Dam construction
- Retaining wall
Ground treatment and temporary construction work are simplified, resulting in a shortened overall construction period! Reduced total construction costs after completion.
- Road construction
Examples and countermeasures in close proximity construction - Solving issues in analysis work -
- Other earthworks, foundation works, and exterior floors
Demonstrating the impact resistance of wall panels (14cm thick) at the actual construction site!
- River construction
By appropriately combining high-intensity ground reinforcement soil work with high-rigidity steel pipe piles, significant shortening of construction time has been achieved!
- Earth retaining wall/foundation reinforcement
It can also be used for vertical joints! This is a rubber joint that is compatible with wide spaces.
- Paving of sidewalks, roads, parking lots and stadiums
Recommended for asbestos removal work/building demolition work!
- Safety and consumables
- Dismantling and moving
- Medicines
In addition to maintenance specifications, it is installed for transporting equipment! It has been adopted for dam renovation work and underground stairs. *Video available.
- Other earthworks, foundation works, and exterior floors
Mega solar construction on slopes and slope renovation work are in full swing! Slope lift [Installation case videos now available].
The aluminum single rail hoisting machine boasts the strongest strength and has been adopted for rental use since 2013. It is active as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega solar installation sites and civil engineering construction sites. It allows for safe work with a focus on improving work efficiency, reducing costs, and ensuring compliance. It can also be used for slope work beside tracks, stair renovation work, dam renovation work, and highway slope work. The rail length can be customized up to a maximum of 95 meters to suit the site. With a 1000W winch, it achieves high-speed lifting at 30 to 35 meters per minute. *It has also been used for the stone wall renovation work at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!* *Videos of installation examples are currently available through the related links below! Please take a look.*
Great for slope construction and slope renovation work! Capable of lifting up to approximately 95 meters, achieving a high-speed lift of 30 to 35 meters per minute!
- Other earthworks, foundation works, and exterior floors
- Transportation System
- Roof and gutter construction
Mega solar construction on slopes and slope renovation work are in full swing! Slope lift [Installation case videos now available].
The aluminum single rail hoisting machine boasts the strongest strength and has been adopted for rental use since 2013. It is active as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega solar installation sites and civil engineering construction sites. It allows for safe work with a focus on improving work efficiency, reducing costs, and ensuring compliance. It can also be used for slope work beside tracks, stair renovation work, dam renovation work, and highway slope work. The rail length can be customized up to a maximum of 95 meters to suit the site. With a 1000W winch, it achieves high-speed lifting at 30 to 35 meters per minute. *It has also been used for the stone wall renovation work at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!* *Videos of installation examples are currently available through the related links below! Please take a look.*
Overcoming underground conditions to achieve ideal external waterproofing! Low-cost construction method for reducing construction time and costs.
- Coating film waterproofing material/permeable waterproofing material
- Waterproofing work
- Earth retaining wall/foundation reinforcement
The key to the waterproofing and corrosion-resistant lining material for water supply facilities is the polyurethane resin, which excels in waterproofing properties.
- Coating film waterproofing material/permeable waterproofing material
- Waterproofing work
- Water Supply Facilities
Spraying two-component polyurethane resin with a special machine, forming a film in just a few seconds with ultra-fast curing.
- Coating film waterproofing material/permeable waterproofing material
- Waterproofing work
- Other civil engineering works
This is a temporary sign for road construction. It uses prism high-brightness reflection, so it has excellent visibility even in a slim design.
- Road construction
- Tunnel construction
- Signs, banners, lanterns, and curtains
Full-fledged local-type mat corresponding to the Invasive Alien Species Act.
- Tree protection materials and plant boxes
- Earthworks
- Pile and foundation work
Using a simple framework! Construction method for protecting and stabilizing slopes.
- Earthworks
- Pile and foundation work
Seed, fertilizer, and soil amendment materials attached! A vegetation mat with fertilizer bags attached to a hexagonal wire mesh coconut net.
- Soil improvement material
- Earthworks
- Pile and foundation work
Promoting long-term greening! Detaching from the net even with a small amount of rainfall and adhering closely to the slope.
- Tree protection materials and plant boxes
- Earthworks
- Pile and foundation work
Suitable for greening within legal frameworks! We would like to introduce the vegetation soil bags that our company handles.
- Dam construction
- Airport facilities
- Erosion control works
A lineup of artificial turf and vegetative soil for cutting and filling, as well as specially formulated mortar!
- Wall and rooftop greenery
- Earthworks
- Pile and foundation work
A special filter demonstrates a high erosion prevention effect! A vegetation mat that suppresses the occurrence of muddy water.
- Earthworks
- Pile and foundation work
Made of natural materials! Eco-friendly thick-layer mat with vegetation substrate.
- Earthworks
- Pile and foundation work
Multi-purpose specification! A vegetation substrate mat that allows for the separate formulation of both herbaceous and woody plants!
- Earthworks
- Pile and foundation work
A vegetation substrate mat that can be applied to soft rock slopes and accommodates various greening goals!
- Earthworks
- Pile and foundation work
Greening foundation work (wire mesh installation) can be used in combination! Introducing vegetation mats applicable to various slopes.
- Earthworks
- Pile and foundation work
- Tree protection materials and plant boxes
Utilizing natural palm fibers! Biodegradable vegetation mat to protect slopes from snowfall and other elements!
- Soil improvement material
- Earthworks
- Pile and foundation work
Promotes the germination and growth of plants! Polyethylene net prevents initial erosion of slopes.
- Tree protection materials and plant boxes
- Earthworks
- Pile and foundation work
Soil particles are filtered inside the filter! A vegetation mat that promotes resource recycling!
- Earthworks
- Pile and foundation work
Promotes water and reaction, and curing work! Introducing a white powder, completely non-dechlorinated antifreeze.
- Earthworks
- Pile and foundation work
- Plastering and painting work
Achieving long-term stable greening! Flexible construction is possible to match the unevenness of slopes.
- Earthworks
- Pile and foundation work
Automatic notification of information regarding heatstroke via business chat.
- Other civil engineering works
- Road construction
- Weather Survey
[ZEROSAI Implementation Case] Regional Development Bureau National Route No. 〇 Road Improvement Project
[Before Implementation] We want to share information about heatstroke on-site and improve safety measures for workers. <Challenges> It is necessary to obtain weather information that is relevant to the site. We need to monitor the Wet Bulb Globe Temperature (WBGT) and share information with all stakeholders in real-time. Using the Weather Forecast Analysis Distribution System [Disaster Prevention Panel], we conducted predictions of the Wet Bulb Globe Temperature (WBGT) and installed weather observation equipment [N Sensor] on-site to monitor the WBGT. Additionally, by linking the Disaster Prevention Panel with business chat, we efficiently shared information with stakeholders.
High-viscosity modified asphalt for steel deck plates. Senafalt SD.
- Dam construction
This is an inspection robot designed to obtain inspection image data on behalf of technicians in areas where visual inspection by technicians is impossible!
- Bridge Construction
You can check the recorded data from mobile devices (iPhone, Android)!
- Site and ground investigation
For small-scale production. No need for dedicated tanks or dedicated tankers.
- Dam construction
A binder with high viscosity and significant flow resistance at 60℃.
- Dam construction
- Paving of sidewalks, roads, parking lots and stadiums
- Pavement construction
Emulsified light-colored binder emulsion.
- Dam construction
- Paving of sidewalks, roads, parking lots and stadiums
- Pavement construction