Ground reinforcement work | SMD method that completely prevents the settlement risk of cohesive soil layers with a sealing effect.
Ground reinforcement work
The Minister-approved SMD method prevents differential settlement accidents in weak, viscous soil using an open-type steel pipe and a special inner and outer wing for pipe internal blockage effects.
Ground reinforcement work is a foundational technology designed to prevent uneven settlement of buildings on weak ground and clay layers, ensuring structural safety over an extended period. Particularly when constructing buildings on thick clay layers containing moisture, neglecting appropriate reinforcement in advance can lead to distortions and defects in the structure due to consolidation settlement. The SMD pile method provided by Geotech Co., Ltd. is a Minister of Land, Infrastructure, Transport and Tourism certified rotary driven steel pipe pile method, equipped with special outer and inner wings at the tip of an open-type small-diameter steel pipe. During the rotary driving process, the inner wings capture soil into the pipe to prevent axial deviation, and upon completion of driving to the target depth, the captured soil completely seals off, creating a strong end bearing capacity. This ensures reliable support performance even on clayey ground (equivalent N value of 27 or lower), eliminating settlement risks from the structural foundation. Our company conducts detailed pre-analysis of soil data and automatic tracking using real-time torque management on-site, achieving high-quality ground reinforcement that objectively proves reliable bottoming through data.
Inquire About This Product
basic information
The SMD pile driving method is a small-diameter rotary driven steel pipe pile method that has obtained certification from the Minister of Land, Infrastructure, Transport and Tourism (TACP-0112/0113, etc.). It uses STK400/490 steel pipes with a main axis diameter ranging from φ89.1 mm to φ267.4 mm, and special wings that are 2 to 3 times the outer diameter are attached to the tip. The maximum construction depth reaches 130 times the axis diameter (up to 34.8 m) and is widely compatible not only with sandy soils but also with cohesive soil layers (equivalent N value of 27 or less). It is equipped with a public calculation formula linked to standard penetration tests (N values), ensuring a reliable specification that guarantees high structural safety.
Price information
Delivery Time
Applications/Examples of results
The SMD method is ideal for foundation reinforcement work for single-family homes, apartment buildings, medical and welfare facilities, and stores planned on thick clay layers or soft ground. It demonstrates tremendous effectiveness in sites where long-term consolidation settlement is a concern with surface improvement or soil-cement columns, and in projects aiming to reduce environmental impact with future demolition and removal in mind. Based on clear technical approval data, it is widely used for ground measures in various buildings and structures to prevent differential settlement accidents in clayey ground.
catalog(3)
Download All Catalogs
Company information
-


![[For Real Estate] Ground Reinforcement Work | Small-Diameter Steel Pipe Pile Method | Geotec Co., Ltd.](https://image.www.ipros.com/public/product/image/321794/IPROS1093147343429230281.jpg?w=280&h=280)



![Ground reinforcement work DM method [Performance certification method]](https://image.www.ipros.com/public/default/object/noimage_l.gif?w=280&h=280)



![[Cart Customization Support] Blind spot confirmation that can be installed on any bridge inspection cart.](https://image.www.ipros.com/public/product/image/2101191/IPROS10664339049652487136.png?w=280&h=280)
