iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36255items
    • Facilities
      Facilities
      57897items
    • Lighting and Interior
      Lighting and Interior
      17467items
    • Common materials
      Common materials
      36866items
    • Civil Engineering Materials
      Civil Engineering Materials
      10193items
    • Construction, work and methods
      Construction, work and methods
      29250items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29659items
    • IT/Software
      IT/Software
      33755items
    • others
      others
      101442items
    • Store and facility supplies
      Store and facility supplies
      4655items
    • Office and commercial supplies
      Office and commercial supplies
      11974items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1072items
    • Logistics Equipment
      Logistics Equipment
      7402items
    • Energy and Resources
      Energy and Resources
      12023items
  • Search for companies by industry

    • Information and Communications
      7300
    • others
      7275
    • Building materials, supplies and fixtures manufacturers
      6689
    • Service Industry
      4815
    • Trading company/Wholesale
      3120
    • Other construction industries
      2461
    • Electrical equipment construction business
      795
    • Construction Consultant
      680
    • General contractors and subcontractors
      676
    • Interior Design
      520
    • Housing manufacturers and construction companies
      502
    • Facility Design Office
      490
    • Architectural design office
      370
    • retail
      365
    • Warehousing and transport related industries
      338
    • Building Management
      320
    • Electricity, Gas and Water Industry
      287
    • Interior construction business
      284
    • Medical and Welfare
      278
    • Educational and Research Institutions
      257
    • Renovation and home construction industry
      232
    • Water supply and drainage construction business
      203
    • Transportation
      182
    • Real Estate Developers
      174
    • Fisheries, Agriculture and Forestry
      137
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      34
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • General contractors and subcontractors
  • Interior Design
  • Housing manufacturers and construction companies
  • Facility Design Office
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Ground foundation construction method
  6. [Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Mar 04, 2026

エルニード協会
エルニード協会
  • Special site
  • Official site

Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.

Can we achieve an overwhelming reduction in construction time? ⬛︎Explanation 1: No "slurry production" (compared to cement milk/pile improvement) In the cement milk method and pile improvement, the process begins with "slurry production," where cement and water are mixed at a batch plant. In fact, this preparation alone takes about 90 minutes for a site using 30 tons of cement. The Super Rappu Elneed method eliminates this entire preparation process. Since the solidifying agent is directly inserted in its package, there is no need for a plant or slurry production. The insertion work that took 90 minutes is completed in just 5 minutes. ⬛︎Explanation 2: No "formwork assembly and dismantling" (compared to the Rappu method) In the Rappu method, after "excavation," "formwork assembly" is performed, and after the concrete hardens, "formwork dismantling" occurs. These tasks require specialized craftsmen and are time-consuming processes. The Super Rappu Elneed method utilizes the sides of the excavation hole as a substitute for formwork (earthen formwork), eliminating the entire series of tasks related to "formwork." This allows for reductions in work time, labor costs, and material costs.

    Ground foundation construction method
002.jpg

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

002.jpg
002.jpg 67ea78497424eed9679815a182c5a3db-1024x768.jpg
  • Related Link - https://el-knead.com/column/%e3%80%90%e4%bb%96%e5%…
  • Special site - Product/service details - https://pr.www.ipros.com/elknead/product/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

For more details, please download the catalog or feel free to contact us.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

For more details, please download the catalog or feel free to contact us.

catalog(2)

Download All Catalogs
Method Manual - Technical Specifications

Method Manual - Technical Specifications

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Method Manual: Cost Comparison and Basic Process Photos

Method Manual: Cost Comparison and Basic Process Photos

PRICE
  • E-book viewing
  • Catalog download

Contact this catalog

Company information

エルニード協会

エルニード協会

Other construction industries

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.

Product/Service List (110)

Popular products in related categories

Soil improvement method "HSS Method"
Construction, work and methods
Soil improvement method "HSS Method"
HSS
High Cement Content Soil Improvement Method "Harden Method"
Surveys, Measurements, and Services
High Cement Content Soil Improvement Method "Harden Method"
アグロジャパン
[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time
Construction, work and methods
[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time
エルニード協会
Geotech CWC Method | Ground Reinforcement for Apartment Buildings
others
Geotech CWC Method | Ground Reinforcement for Apartment Buildings
ジオテック
Soil Improvement Method "Solid Cube Method"
Construction, work and methods
Soil Improvement Method "Solid Cube Method"
本久

Related New Products

Site Investigation | Optimization of Pile Length and Cost for Small Steel Frame Buildings through Data Comparison and Detailed Surveys
Surveys, Measurements, and Services
Site Investigation | Optimization of Pile Length and Cost for Small Steel Frame Buildings through Data Comparison and Detailed Surveys
ジオテック
Ground reinforcement work | Building environmentally friendly foundations using DM method with recycled materials.
Construction, work and methods
Ground reinforcement work | Building environmentally friendly foundations using DM method with recycled materials.
ジオテック
Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.
Construction, work and methods
Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.
ジオテック
Ground reinforcement work | Establishing a foundation design based on evidence using the DM method of GBRC performance certification.
Construction, work and methods
Ground reinforcement work | Establishing a foundation design based on evidence using the DM method of GBRC performance certification.
ジオテック
Ground reinforcement work | A reliable structure that prevents differential settlement accidents of buildings using the high-support capacity DM method.
Construction, work and methods
Ground reinforcement work | A reliable structure that prevents differential settlement accidents of buildings using the high-support capacity DM method.
ジオテック

The related categories of Ground foundation construction method

  • Construction, work and methods
  • Construction methods and technologies
  • Ground foundation construction method
Find products and companies by related keywords
  • #Construction method
  • #Improved Construction Method
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.