Proven track record of handling various projects! Case study of the SR-45 multi-drill rig.
We would like to introduce a case study of underground obstacle removal conducted by our company. In Shibuya, Tokyo, we carried out the removal of steel pipe piles. We removed a steel pipe pile with a length of 15m that could not be extracted using the existing pile extraction method, utilizing the SR-45 multi-drill excavator. For more details about the case, please refer to the related link. 【Case Overview】 ■ Project Name: Removal of Steel Pipe Piles Using SR-45 Multi-Drill Excavator ■ Date of Construction: February 22, 2023 ■ Location: Shibuya, Tokyo *For more information, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.