Replace in a short time! The newly assembled girder on the frame will be moved horizontally and connected!
We would like to introduce the construction case of M.M. Bridge Co., Ltd. With the extension of the Sanriku Coastal Road, the Tadakoshi Bridge, which was bending towards National Route 45, was replaced to face the direction of the Kesennuma No. 2 Tunnel (tentative name) by implementing the "replacement of the Tadakoshi Bridge." The existing girders were cut at both ends and moved horizontally, and the newly constructed girders assembled on the support were also moved horizontally and connected. For detailed information about the case, please refer to the related catalog. [Overview] - Until now, the Sanriku Coastal Road has connected to National Route 45, and the bridge was bending towards Route 45. - With the extension of the Sanriku Coastal Road, the bridge will become straight. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is a comprehensive engineering firm specializing in steel structure products, starting with bridge projects. With advanced technology and extensive experience cultivated over many years, we respond to our customers' needs through the design, construction, and maintenance of bridges and steel structures, providing high-quality social infrastructure. Please feel free to contact us if you have any inquiries.