List of Bridge Construction products
- classification:Bridge Construction
1~45 item / All 587 items
Solving road flooding! It also demonstrates its effectiveness against sudden heavy rain.
- Road construction
[Catalog Renewal] Increased the number of construction photos for the "Neplus Method" and "Kanetsuke Catalog."
In February 2020, Kitamura Concrete Industry Co., Ltd. renewed the "Neplus Method Catalog" and the "Kanzuke Catalog." We have increased the number of construction photos compared to the previous catalogs, so please make use of them. 【Contents (Excerpt)】 <Neplus Method Catalog> ■ Construction Types - Soundproof Type - Slit Type - Buried Type - Circular Drainage Type <Kanzuke Catalog> ■ Features ■ Construction Examples
Continuous adoption on Meishin Expressway and Keiji Bypass. A large expansion joint with a proven durability of 100 years【Hybrid Joint Type 3LII】.
- Bridge Construction
- Road construction
A construction case of the Kozagawa Ohashi Bridge where work could be carried out without the influence of waves, except for the lowering of the liner plate!
- Bridge Construction
A case where the construction period was shortened by dividing the workers into two teams and carrying out the main tasks simultaneously!
- Bridge Construction
Introducing a case study of the temporary closure LPF method implemented in a narrow space of approximately 2.0m in height!
- Bridge Construction
Lower the platform to the point of submergence while securing the suspended space as the water level fluctuates!
- Bridge Construction
Introducing a case of temporary closure using the LPF method constructed in a narrow space of approximately 2.3m in height!
- Bridge Construction
An example of increasing the strength of liner plates and vertical beams to cope with water pressure!
- Bridge Construction
Due to the fast flow of water and its impact, the vertical beams in the upstream section were installed in advance to respond to the descent!
- Bridge Construction
Temporary cutoff LPF method for constructing bridge piers in the central part of shallow rivers in Chuo Ward, Tokyo!
- Bridge Construction
Due to the difficulty of road occupancy, material delivery and construction will be carried out using a steel barge and a crab crane!
- Bridge Construction
A case where materials were transported using a combination of a rough-terrain crane from the bridge deck and a simple float barge!
- Bridge Construction
Due to heavy traffic and difficulty in occupying the road, a crab crane is mounted on a spud-type steel barge!
- Bridge Construction
Adopting a small crawler crane in a low headroom and windy site to enhance mobility!
- Bridge Construction
Don't overlook insufficient concrete filling and compaction! A sheet-type sensor (Juuten Mieruka) that visualizes the concrete filling condition and compaction level.
- Tunnel construction
- Foundation construction
- Bridge Construction
The 3rd Bridge and Tunnel Technology Exhibition is currently being held!
The 3rd Bridge and Tunnel Technology Exhibition at Makuhari Messe is thriving thanks to your support! It's great to hear directly from visitors who wanted to see the Juutenmieruka in person. We will be exhibiting until 5 PM today, the 29th. We look forward to seeing you at Booth I-23 in Hall 6!
The hassle of moving the cart every time for confirmation is no longer necessary. With just one tablet, you can simultaneously display images from up to four locations, significantly reducing the numb...
- Construction machinery leasing and rental
- Bridge Construction
- Renovation and repair methods
You can consult whether it can accommodate your company's cart. Customize the shape, length, and angle of the camera to ensure optimal blind spot checks for any bridge inspection cart.
- Construction machinery leasing and rental
- Bridge Construction
- Renovation and repair methods
Eliminate all blind spots in bridge inspections with real-time video. Easily attachable to the inspection cart with magnets, allowing for simultaneous monitoring of all areas from a tablet using up to...
- Construction machinery leasing and rental
- Renovation and repair methods
- Bridge Construction
Eliminate blind spots in bridge inspections that cannot be addressed by visual inspection alone, using camera footage. Achieve a high-quality inspection system with zero oversights, now possible with ...
- Construction machinery leasing and rental
- Renovation and repair methods
- Bridge Construction
Reduce industrial waste! Achieve a sustainable infrastructure maintenance cycle.
- Bridge Construction
★New Catalog★ Circulating Hybrid Blast System ~An environmentally friendly construction method~
The "Circulating Hybrid Blast System Method" is an environmentally friendly technique that significantly reduces industrial waste and CO2 emissions by circulating and repeatedly projecting abrasive materials. Additionally, by using steel grit as the abrasive material, it efficiently removes coatings that contain harmful substances such as lead, PCBs, and chromium. The catalog has been completed, so please take a look.
Suppress the leaching of heavy metals from contaminated soil and also solidify the soil! It can achieve a reduction in treatment costs!
- Bridge Construction
- Civil Engineering Company
Suitable for the plate method with metal putty! 'KAN Putty Wear-Resistant Metal' can simultaneously expect adhesion, corrosion resistance, and wear resistance.
- Paving Materials
- Bridge Materials
- Bridge Construction
Recommended for asbestos removal, bridge construction, facility demolition, etc.!
- Dismantling and moving
- Bridge Construction
- Safety and consumables
[Exhibition Information] 22nd Japan Textile Material Research Seminar
We will be exhibiting at the "22nd Japan Fiber Material Research Seminar" to be held on May 22, 2026 (Friday). We plan to showcase dust protection clothing and other items. We look forward to your visit! ● Date: May 22, 2026 (Friday) 11:00 AM - 4:00 PM ● Venue: BDK Conference Room, 7th Floor, Buddhist Propagation Center Building, (Public Interest Incorporated Foundation) (Tokyo) 'Mi no Ma' For more details, please feel free to contact us through the related link below: [Protective Clothing Wisdom.com]. [Protective Clothing Wisdom.com] is a comprehensive information site for safe working environments, providing information on protective clothing and equipment by work environment, methods for putting on and taking off, and customer usage records.
This is a precast formwork that significantly improves the durability and crack distribution of structures!
- Bridge Construction
High-performance polyethylene pipes suitable for emergency tunnel equipment and fire-fighting equipment's distribution main!
- Fire extinguishing equipment
- Bridge Construction
- Dam construction
NEXCO, our polyethylene pipes have been certified in the common specifications.
Thank you very much for your continued patronage. Following NEXCO Central Japan, we are pleased to announce that NEXCO East Japan and NEXCO West Japan have also recognized and included the "Fiber-Reinforced Polyethylene Pipe" (equivalent to WEET-AP) in their common specifications for piping materials in tunnel emergency equipment construction. 【Tunnel Emergency Equipment Water Supply Main】WEET-AP ○ The composite pipe enhances internal pressure strength and suppresses creep. The anti-corrosion layer protects the polyethylene conduit from external damage and UV degradation, maintaining pipe performance over a long period. ○ Utilizing the characteristics of polyethylene pipes, we have developed an advanced composite polyethylene pipe reinforced with aramid fibers using our unique technology, which has been registered with NETIS. 【NETIS Registration No. QS-100028-A】 Product Name WEET-AP: Aramid-Reinforced Polyethylene Pipe Usual Operating Pressure: 1.2MPa, 1.6MPa, 2.0MPa, Nominal Diameter: W75 to W350 For more details about the product, please refer to the product page or catalog, or feel free to contact us. We appreciate your continued support.
It is widely used in general embankments, retaining walls, coastal areas, reservoir banks, and bridge abutments!
- Bridge Construction
- Reinforced earth wall
Maximum descent distance of 65m! A vehicle-type gondola that makes close visual inspections at the top of the pier easier. For efficient bridge inspection and repair.
- Bridge Construction
- Bridge Materials
- Construction machinery leasing and rental
A "gondola vehicle" that can approach up to 100 meters below the maximum, even to bridge pier surfaces that are difficult to see up close. Suitable for large bridges. *Registered product in NETIS.*
- Bridge Materials
- Bridge Construction
- Construction machinery leasing and rental
We provide a full lineup tailored to the usage locations of bridges, enabling access to all areas of the bridge.
- Bridge Construction
- Bridge Materials
Overwhelming mobility! Equipped with a lift deck that reaches deep under the beams.
- Bridge Construction
- Bridge Materials
- Construction machinery leasing and rental
High durability and simple embedded joints Innovative bridge expansion device
- Bridge Construction
Safe bridges in snow-covered areas. Compliant with the specifications set by the Tohoku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism.
- Bridge Construction
On February 26, 2026, an advertisement for the bridge expansion device "Hybrid Joint" was published in the Tohoku 6 Prefectures edition of the Sankei Shimbun, demonstrating a durability of 100 years (3LII type) verified by a third-party organization.
Crittec Industries Co., Ltd. published a newspaper advertisement (black and white, full-page 15 columns) for the bridge expansion device "Hybrid Joint" in the February 26, 2026 issue of the Sankei Shimbun Tohoku 6 Prefectures edition. In Japan, the number of bridges over 50 years old is rapidly increasing, making the longevity of bridges a critical issue. The expansion devices, which are considered a cause of bridge damage, require high water-tightness and long-term durability. Our expansion device "Hybrid Joint" offers multiple types tailored to different bridge types and conditions. Among them, the "Hybrid Joint 3LII type" has demonstrated a durability of 100 years in fatigue loading tests conducted by a third-party organization. It has successfully passed 12 million cycles of repeated loading at a maximum load of 260 kN, confirming performance equivalent to a 100-year design service life for bridges. We have numerous delivery records in the six Tohoku prefectures and can accommodate a wide range of bridge types, including steel and PC bridges. The special website linked to the advertisement allows for the review of detailed materials and inquiries or requests for documents. Please make use of it for comparing and considering bridge renewal and repair plans. Crittec Industries will continue to contribute to the longevity of bridges nationwide, starting with the Tohoku region.
Surface sensors for intrusion monitoring.
- Bridge Construction
Frame scaffolding takes time to master, and there can be variations in accuracy depending on the individual. Stabilize the process with the easy-to-assemble Iq system. It accommodates high floor heigh...
- Scaffolding and Support Materials
- Temporary Construction
- Bridge Construction
Significantly improved workability! Introducing a construction method that ensures high product precision and easily secures construction accuracy.
- Renovation and repair methods
- Reinforcement and repair materials
- Bridge Construction
A new connection structure for pretensioned PC girders! Ideal for replacing cast-in-place hollow slabs. Updating while utilizing existing piers. Of course, it's also suitable for new bridge constructi...
- Special Construction Method
- Bridge Construction
- Bridge Materials
Safely support the deterioration diagnosis of bridges. Improve work efficiency with 3D area management.
- Bridge Construction
- Steel structure construction
- Reinforced concrete construction
Visualize the construction area in 3D to improve progress management and safety.
- Bridge Construction
- Steel structure construction
- Reinforced concrete construction
Improving the safety of crane operations. Avoiding hazards through 3D area management.
- Bridge Construction
- Steel structure construction
- Reinforced concrete construction
Prevent delays in the important process of concrete pouring with pinpoint forecasts two weeks in advance.
- Bridge Construction
[ZEROSAI Introduction Interview] Akita Prefecture, Japan PS Co., Ltd. Preventing delays in the important process of concrete pouring with pinpoint weather forecasts two weeks in advance.
Issues - Since there is only one ready-mixed concrete manufacturer, it is difficult to change the procurement schedule immediately, and we must make decisions on changing the concrete pouring process early. - When the client requested weather information, we had to retrieve past data from the Japan Meteorological Agency, but often being far from the site made it difficult to determine which information was accurate. Implementation Points - We will proceed with site work leading up to the concrete pouring date, and since forecasts can be viewed two weeks in advance, we can implement measures early. - We can retain weather information that is relevant to the site. Implementation Results *For more details, please refer to the PDF document or feel free to contact us.
A next-generation scaffolding with a height of 1,900mm that enables the shortening of construction periods for bridge works.
- Scaffolding and Support Materials
- Temporary Construction
- Bridge Construction
Next-generation scaffolding that achieves a wide space and high safety.
- Scaffolding and Support Materials
- Temporary Construction
- Bridge Construction
Smart safety management for cranes!
- Bridge Construction