Confirmation of the effectiveness of NMR pipe protectors by the Yokohama City Waterworks Bureau.
Confirmed the rust prevention effect of the NMR pipe protector within the conditions of its effectiveness in the area of the piping.
To demonstrate the rust prevention effect of the NMR pipe protector, it is a condition that a certain amount of water flows within the piping. In the Konan Chuo area, where the rust prevention effect test was conducted, the minimum water usage for a 50A pipe was 4.4 tons per day, but only three households used this water, resulting in a total water usage of 1 ton per day (with an average usage of 350 liters per household), which is very low. In the Teramachi 2-chome area, the number of households using water for each branched pipe with a diameter of 50A was six and eight, respectively, with the six households using about 2 tons of water per day and the eight households having a total water usage of just under 3 tons per day. Due to insufficient water usage, a clear rust prevention effect could not be confirmed. However, in the Tsurumi Public Housing and Hazawa area, where similar verification tests were conducted, the conditions were met. In Tsurumi Public Housing, the red rust in the water supply pipe decreased from 0.27 mg/l to 0.12 mg/l six weeks after the installation of the NMR pipe protector, and an increase in residual chlorine concentration, which had been reduced due to red rust, was confirmed. In the Hazawa area, the residual chlorine concentration, which had decreased by 45.3%, improved significantly to a reduction of 13.6%. The Yokohama City Waterworks Bureau has concluded the tests as there are no more suitable locations to further test the rust prevention effect of the NMR pipe protector.
Inquire About This Product
basic information
The Yokohama City Waterworks Bureau conducted the following three tests: "Verification of the prevention of red rust in the water supply pipes at the Tsurumi Public Office using the NMR Pipe Protector and the prevention of chlorine concentration reduction for disinfection," and "Verification of the prevention of chlorine concentration reduction for disinfection due to red rust using the main water supply pipe with the NMR Pipe Protector." Materials can also be downloaded from the catalog below.
Price range
Delivery Time
Applications/Examples of results
Cumulative results of piping extension exceed 4,200 buildings!
catalog(11)
Download All Catalogs








News about this product(3)
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpassing 4,300 buildings! (As of March 2022) Among them, over 3,000 installations in condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Care House Shirasagi (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)," TOKYO MX's "Corporate Spirit," and specialized newspapers "Condominium Management News" and "Air Conditioning Times."