Ideal for bridges with high elevation restrictions! Simplifying the structure makes on-site construction management easier and can shorten the construction period.
The "High-Strength PC Girder" has a lower girder height compared to other construction methods, making it suitable for bridges with girder height restrictions. By simplifying the structure, on-site construction management is made easier, and the construction period can be shortened. We have our own unique computer program for stress calculations, allowing for quick processing even under special design conditions. 【Design Examples】 ■ Pre-tensioning method ■ Post-tensioning method / Box girder type ■ Post-tensioning method / Hollow girder type *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was established in April 1952, focusing on the uniqueness of prestressed concrete (PC) introduced from France at that time. As a pioneer of PC technology in our country, we have contributed to national land development and the advancement of local communities for over 60 years, primarily through bridge construction. Moving forward, we are committed not only to new construction projects but also to enhancing measures for the longevity of bridges, strengthening maintenance and repair technologies, and developing new technologies and methods, all in efforts to create PC structures that meet societal needs.