[Video Available] Measures against abnormal weather, guerrilla rainstorms, and rainwater!
No worries if obstacles appear underground! The tunneling machine detects and captures obstacles about 2 meters ahead, allowing for cutting of the obstacles! [Performance report available]
Due to the progress of global warming, abnormal weather such as guerrilla rainstorms is occurring more frequently. We want to carry out sewer construction and advance rainwater measures, but we often hear that construction is not progressing due to a lack of personnel caused by Olympic construction and other projects. Even when construction begins, there are often obstacles buried underground that prevent progress, leading to wasted time and money. Therefore, we recommend the milling mole method, which is safe even when underground obstacles are encountered! The "milling mole method," equipped with four special functions: "exploration, improvement, cutting, and guidance," consists of three devices: a tunneling machine, special bits, and a special telescopic pipe, allowing for the precise cutting and removal of underground obstacles. Using electromagnetic waves, it explores and pushes forward while tunneling through metal obstacles ahead, and it is also possible to improve the ground from within the tunneling machine before and after the detected obstacles. If an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued advancement. The system also includes the installation of a receiving coil at a designated position within the access shaft to guide the tunneling machine to that location, making it a high-precision advancement method even when obstacles are present.
Inquire About This Product
basic information
【Obstacles Encountered】 ■ Wooden Piles ■ PC Piles ■ Steel Pipe Piles ■ Steel Sheet Piles ■ H-beams ■ Continuous Walls ■ Concrete Structures *For more details, please download the [Obstacles Performance Collection] or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
CASE-7 Steel Sheet Piling 3・H Steel Cutting
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.