Cutting of Storage Steel Sheet Pile Type III! Construction Case in Areas Where Road Regulations are Difficult.
We would like to introduce the construction results of the sewer pipe installation project in Umiyama Town, commissioned by the Sakai City Waterworks Bureau. It was believed that there was one location with a Type III steel sheet pile in the thrust pipeline section. The road where the thrust pipe was to be laid is a major thoroughfare with heavy traffic, making it difficult to regulate the road, so the project involved cutting the existing Type III steel sheet pile. As a result of the construction, one Type III steel sheet pile was cut. 【Construction Details】 ■ Project Name: Umiyama Town Sewer Pipe Installation Project ■ Client: Sakai City Waterworks Bureau, Sewer Division, Sewer Construction Section ■ Contractor: Union Tech Co., Ltd. ■ Pipe Diameter: 1100 ■ Thrust Length: 69.840m ■ Soil Type: Sandy Soil ■ N Value/Gravel Ratio/Maximum Gravel Diameter: N=4-9 G=0% φmax=57mm ■ Construction Period: August 2015 to September 2015 (1 month) ■ Type of Obstacle: Type III Steel Sheet Pile, 1 location *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
"Milling Mall Method: Four Special Functions" ◎ Exploration: Detecting metal obstacles ahead while advancing the excavation ◎ Improvement: Ground improvement from inside the tunneling machine before and after the obstacles ◎ Cutting: Crushing and discharging metal obstacles ◎ Guidance: Guiding the tunneling machine to the designated position of the vertical pile *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.