It is possible to cut through obstacles and achieve long-distance propulsion! The milling mole method is reliable even when obstacles arise and is a preferred propulsion method nationwide!
The excavation machine used in shield construction can dig horizontally through the ground and is mainly utilized for tunneling in subways and sewage systems. However, if there are underground obstacles during excavation, the construction may come to a halt. To address this, the milling mole method is enhanced by equipping the shield machine with four special functions: "exploration, improvement, cutting, and guidance," allowing it to cut through obstacles and enable long-distance advancement! The underground obstacle-responsive mud pressure propulsion method, known as the "milling mole method," consists of three devices: the excavation machine, a special telescopic pipe, and a special injection pipe, which can finely cut and discharge underground obstacles! Using electromagnetic waves, it explores and detects metal obstacles ahead while advancing, and it is also possible to improve the ground from within the excavation machine before and after the detected obstacles. If an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing the propulsion to continue. 【Applicable Obstacles】 ■ Wooden piles ■ PC piles ■ Steel pipe piles ■ Steel sheet piles ■ H-beams ■ Continuous walls ■ Concrete structures
Inquire About This Product
basic information
【Obstacles to Address】 ■ Wooden Piles ■ PC Piles ■ Steel Pipe Piles ■ Steel Sheet Piles ■ H-Beams ■ Continuous Walls ■ Concrete Structures *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All Catalogs![[Presenting Construction Achievements] Milling Mold Method - Performance Collection by Obstacle Type](https://image.www.ipros.com/public/catalog/image_generated/01/e63/416842/416842_IPROS534497240660240509_1.jpg?w=120&h=170)
![[Presenting Construction Achievements] Milling Mold Method - Collection of Achievements by Obstacle Type 2](https://image.www.ipros.com/public/catalog/image_generated/01/878/420525/420525_IPROS6942482987118869746_1.jpg?w=120&h=170)
Company information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.