Subsurface Obstacle Adaptable Slurry Shield Tunneling Method *Performance Collection by Obstacle Type Available!
The milling mall method is safe even when obstacles appear! A thrust method chosen nationwide, compatible with diameters from φ800 to 3000 mm. *Registered with NETIS.
The underground obstacle response type mud-based thrusting method "Milling Mole Method," equipped with four special functions: exploration, improvement, cutting, and guidance, consists of three devices: a tunneling machine, a special telescopic pipe, and a special injection pipe, allowing for the fine cutting and discharge of underground obstacles. Using electromagnetic waves, it explores metal obstacles ahead while thrusting and can also improve the ground from within the tunneling machine before and after the detected obstacles. In the event that an obstacle is detected, the special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued thrusting. Furthermore, a system is also equipped to guide the tunneling machine to a designated position by installing a receiving coil at the specified location within the arrival shaft, enabling high-precision arrival even in the presence of obstacles. 【Performance by Obstacle Type】 ■CASE-6 Steel Sheet Pile 3W Cutting ■CASE-7 Steel Sheet Pile 3 & H Steel Cutting ■CASE-8 Wooden Pile & Steel Sheet Pile Cutting ■CASE-9 H Steel & Existing Manhole Wall Cutting ■CASE-10 Underground Continuous Wall & Metal Object Cutting *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Corresponding Obstacles】 ■ Wooden Piles ■ PC Piles ■ Steel Pipe Piles ■ Steel Sheet Piles ■ H-Beams ■ Continuous Walls ■ Concrete Structures *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
CASE-7 Steel Sheet Piling 3・H Steel Cutting
catalog(4)
Download All Catalogs![[Presenting Construction Achievements] Milling Mold Method - Performance Collection by Obstacle Type](https://image.www.ipros.com/public/catalog/image_generated/01/e63/416842/416842_IPROS534497240660240509_1.jpg?w=120&h=170)
![[Presenting Construction Achievements] Milling Mold Method - Collection of Achievements by Obstacle Type 2](https://image.www.ipros.com/public/catalog/image_generated/01/878/420525/420525_IPROS6942482987118869746_1.jpg?w=120&h=170)
Company information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.