When it comes to construction work, it's the "Milling Mall Method"! *A collection of achievements by obstacle type is currently being distributed.
[NETIS Registered] No worries even if obstacles appear! A construction method that is starting to be chosen nationwide! Compatible with diameters from φ800 to 3000 mm.
The underground obstacle response type mud-based thrusting method "Milling Mole Method," equipped with four special functions: exploration, improvement, cutting, and guidance, consists of three devices: a tunneling machine, a special telescopic pipe, and a special injection pipe, allowing for the precise cutting and discharge of underground obstacles. Using electromagnetic waves, it explores metal obstacles ahead while thrusting and can also improve the ground from within the tunneling machine before and after the detected obstacles. In the event that an obstacle is detected, the special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued thrusting. Furthermore, a system is installed to guide the tunneling machine to a designated position within the arrival shaft by placing a receiving coil at that location, making it the ultimate thrusting method that can accurately lead to the destination even in the presence of obstacles. 【Performance by Obstacle Type】 ■CASE-1 Cutting of Fume Pipes ■CASE-2 Cutting of PC Piles ■CASE-3 Cutting of H Steel and Reinforced Concrete ■CASE-4 Cutting of H Steel Existing Manhole Walls ■CASE-5 Cutting of Wire Tetrapods *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Obstacles to be addressed】 ■ Wooden piles ■ PC piles ■ Steel pipe piles ■ Steel sheet piles ■ H-beams ■ Continuous walls ■ Concrete structures *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
CASE-1 Hume pipe cutting removal Discharged metal pieces, propulsion pipe color, and rebar
-
CASE-2 PC anti-cutting removal of discharged metal pieces
-
CASE-3 H-beam and reinforced concrete cutting removal Discharged reinforced concrete pieces
-
CASE-4 H-beam existing manhole wall cutting removal Discharged metal pieces
-
CASE-5 Wire Tetrapod Cutting Wire Piece
catalog(4)
Download All Catalogs![[Presenting Construction Achievements] Milling Mold Method - Performance Collection by Obstacle Type](https://image.www.ipros.com/public/catalog/image_generated/01/e63/416842/416842_IPROS534497240660240509_1.jpg?w=120&h=170)
![[Presenting Construction Achievements] Milling Mold Method - Collection of Achievements by Obstacle Type 2](https://image.www.ipros.com/public/catalog/image_generated/01/878/420525/420525_IPROS6942482987118869746_1.jpg?w=120&h=170)
Company information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.