Significant shortening of construction time is possible! A new ground improvement method that contributes to cost reduction.
The "CDM-Land4 Method" is a construction method that utilizes a set of four axes, allowing for simultaneous construction with four axes. This results in reduced construction time, lower costs, and excellent mixing performance, enabling the creation of high-quality improved ground. With the development of the extension rod, deep construction has become possible, achieving a construction height approximately 10 meters lower than conventional construction machinery and realizing a more efficient construction cycle compared to traditional extension methods. 【Features】 ■ Significant reduction in construction time ■ Contribution to cost savings ■ Creation of high-quality improved ground with minimal variation due to simultaneous four-axis mixing ■ High construction precision ■ Compatibility with a wide range of improvement methods For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Specifications】 ■ Stirring blade shape: φ1,000mm / φ1,200mm / φ1,300mm ■ Maximum penetration depth from the ground surface: 40m / 30m / 20m ■ Improved area [m²/set] ・ Block shape: 2.83 / 4.21 / 5.00 ・ Circular lap shape: 2.00 / 4.34 / 5.11 ・ Single pile circular shape: 3.14 / 4.52 / 5.31 * For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.