[Construction Case] Leisure Facility: Subfloor Settlement Correction Work (Ibaraki Prefecture)
Due to the impact of the Great East Japan Earthquake, subsidence! Adjusted 350m2 with four consecutive nights of construction.
Here is an example of "subfloor sinking correction work" carried out at a leisure facility in Ibaraki Prefecture. Correction work was implemented for a significantly sunken floor in the pachinko area within the facility. Sinking was also observed in other areas, including in front of the machine room and in the restrooms, and sinking correction work was conducted over a total construction area of approximately 350m2 over four consecutive nights. 【Case Overview】 ■Construction Area: Approximately 350m2 ■Maximum Sinking Amount: 93mm ■Area: Ibaraki Prefecture ■Construction Period: Four consecutive nights (2011) *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other