[Construction Example] Apartment: Correction of Sunken Floor Slab / Underfloor Void Filling Work
The ground floor slab has sunk due to the earthquake! A case study of improvements made to the gaps between the floor and walls, and between the walls and ceiling.
We would like to introduce a case of "floor sinking correction work" and "underfloor void filling work" carried out in a condominium located in Higashi Ward, Kumamoto City, Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, the floor of the first floor of the condominium sank, creating gaps between the floor and walls, as well as between the walls and ceiling. By adopting the Upcon method, which allows for corrections without the need to move, the gaps that had formed between the floor, ceiling, and walls due to sinking were improved. 【Case Overview】 ■ Construction Area: 1200m2 ■ Maximum Sinking Amount: 61mm ■ Area: Kumamoto City, Kumamoto Prefecture ■ Construction Period: 15 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.