[Construction Example] Elementary School (Classroom): Floor Sunken Correction Work and Deflection Correction Work
Due to ground subsidence, the classroom floor has sagged! The floor subsidence was corrected in a short construction period of one day.
We would like to introduce a case of "sunken floor correction work and deflection correction work" conducted in an elementary school classroom in Tokyo. Due to ground subsidence, a maximum of 80mm of sinking occurred in the center of the floor, causing deflection. Concerns for safety and health rendered the classroom unusable. The areas of the classroom floor that had sunk were corrected to -10mm, moving from the outer edges toward the center. The deflection of the classroom floor was resolved, and the work was completed. 【Case Overview】 ■ Construction Area: 63m2 ■ Maximum Subsidence: 80mm ■ Construction Period: 1 day ■ Area: Tokyo *For more detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
The detailed content of the case can be viewed through the related link. For more information, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
*The details of the case can be viewed through the related link. For more information, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.