[Construction Case] Elementary School: Floor Settlement Correction Work and Underfloor Void Filling Work
The floor has sunk due to consolidation settlement! Voids (cavities) can be seen under the floor, and we will carry out construction.
We would like to introduce a case where we performed "floor sinking correction work" and "underfloor void filling work." The construction site was an elementary school located in Gifu Prefecture. Due to consolidation settlement, the floors of classrooms and the art room in the elementary school sank, and voids (cavities) were also observed under the floor. The area of the sinking correction was approximately 83m², with a maximum sinking amount of 64mm. Additionally, the maximum void amount was 40mm, and the construction period was 2 days. 【Case Summary】 ■ Area of sinking correction: Approximately 83m² ■ Maximum sinking amount: 64mm ■ Area of void filling: Approximately 165m² ■ Maximum void amount: 40mm ■ Area: Elementary school in Gifu Prefecture ■ Construction period: 2 days *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*The detailed information about the case can be viewed through the related link. For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*The details of the case can be viewed through the related link. For more information, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.