Transform the 'wooden stop form' set at the construction joints into permanent formwork! Achieve significant reductions in construction time for concrete structures.
The "SF (Speed Form) Method" has been adopted in over 3,100 cases for retaining walls, valley stop works, etc., by the Ministry of Land, Infrastructure, Transport and Tourism, the Forestry Agency, and prefectures.
To suppress cracking of concrete during the construction of concrete retaining walls, a "wooden stop form" that fixes joint materials installed at intervals of 10 to 20 meters is replaced with "slate boards" and "vertical steel materials" that have performance and functionality equal to or greater than the poured concrete, allowing for the construction of permanent embedded forms.
This enables the simultaneous construction of multiple spans, significantly shortening the construction period for concrete structures.
【Features】
■ Multiple spans can be constructed simultaneously during concrete pouring
■ Eliminates the hassle of removing forms
■ Allows for proceeding to the next process regardless of the concrete's stripping strength
■ Ensures sufficient curing, preventing temperature drop and drying of the surface of the poured concrete
*For more details, please refer to the PDF materials or feel free to contact us.