Office Building Tea Room | Case Study on the Adoption of Pressurized Drainage Pump Units
Introducing a case that completely overcomes layout restrictions with no underfloor piping space and no drilling allowed!
We would like to introduce a case where the "Zarai NPBW (ZA-100NPBW)" was installed in the tea room of an office building. In this case, there was a challenge of wanting to set up a tea room for a tenant on the first floor, but due to the OA floor, there was no space for underfloor piping, and it was also not possible to drill holes in the floor, which limited the layout. During the installation of the equipment, each inflow pipe was individually piped, using the connection points of four pump units. The piping route utilized the ceiling, with a discharge pipe rising 3 meters and running horizontally in the ceiling to connect to the existing drainage pipe. 【Case Overview (Partial)】 ■ Installation Location: Office Building Tea Room ■ Model: Zarai NPBW (ZA-100NPBW) ■ Connected Equipment: 2 sinks, coffee machine, water heater, ice maker *For more details, please download the PDF or feel free to contact us.
- Company:スマートポンプジャパン 東京本社
- Price:Other