Improvement works Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

Improvement works Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  3. 山下工業 Kyoto//Other construction industries
  4. 4 エルニード協会 Kagawa//Other construction industries
  5. 5 コンクリートコーリング Tokyo//Other construction industries

Improvement works Product ranking

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

  1. TRD method Taiyo Kisokogyo Co.,Ltd.
  2. HiroWork Kmighty Method Taiyo Kisokogyo Co.,Ltd.
  3. Achieving low-cost construction! Rappuru concrete foundation ground improvement work. エルニード協会
  4. 4 Groundwater Level Measurement Method (Chikachan) HOKOKU ENGINEERING CO.,LTD.
  5. 5 Concrete crushing method "Buster Method" コンクリートコーリング

Improvement works Product List

46~60 item / All 97 items

Displayed results

Antibacterial Drainage Pipe Rehabilitation Method "Cyclone Super Coat Method" ◎ Certified Examination Method

A new proposal for drain pipe maintenance that prevents the growth of bacteria in the drainage pipes through antibacterial processing, helping to avoid issues such as clogs and odors! Installation in as little as one day.

The "Cyclone Super Coat Method" is a construction method that adds an "antibacterial" function to drainage pipe rehabilitation work. (Building Preservation Center, Certification of Preservation Technology for Buildings, Certification No. 1101-A-1) With speedy polishing and an antibacterial lining material that is resistant to dirt, this method achieves the long lifespan of damaged drainage pipes in apartments and buildings, as well as a reduction in maintenance costs. 【Features】 ■ "Cyclone," an evolved suction rehabilitation method for drainage pipes ■ A longevity strategy by lining the inner surface with a special coating while utilizing existing piping ■ Development of a dedicated nozzle for high-pressure polishing that further enhances conventional polishing precision ■ Use of inorganic antibacterial paint, making it difficult for dirt to adhere after painting and ensuring smooth water flow ■ Integrated construction of shared vertical pipes and branch pipes, generally resulting in a short construction period of one system per day ■ There is a possibility of constructing piping that cannot be implemented with other methods *For more details, please download the PDF or feel free to contact us. TEL: 047-421-1077 Contact: https://taikoh-e.com/contact-3/

  • Water supply facilities
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] Who is responsible for liquefaction?

We are publishing information on the occurrence sites of liquefaction, as well as the recurrence of liquefaction and liquefaction countermeasure construction!

This document introduces the responsibility for liquefaction. It includes the history of liquefaction, the mechanisms of liquefaction, predictions of liquefaction, and liquefaction countermeasure plans. The Great East Japan Earthquake that occurred on March 11, 2011, caused significant liquefaction damage in the metropolitan area, far from the epicenter. The issue of liquefaction became prominent precisely because it occurred in the metropolitan area. For more details, please refer to the document. [Contents (partial)] ■ History of liquefaction ■ Mechanisms of liquefaction ■ Locations of liquefaction ■ Recurrence of liquefaction ■ Liquefaction damage *For more information, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case: Injection Work

Injecting a solidifying agent into the voids of sandy soil! Introducing a method to improve the stability of the ground.

"Injection grouting" is a method of improving sandy soil by injecting a solidifying agent (chemical solution) into the voids of the soil to stabilize it. First, a survey is conducted to check for any obstacles, and the construction site is marked. A boring machine is set up, and while supplying drilling fluid (Chemical A and B), the drilling rod is used to inject the solution under pressure, drilling to the specified depth. In the first stage, a fast-setting type of chemical is used to fill large voids in loose sand layers and cohesive soil sections, preventing the injected material from diffusing or leaking from the injection site. In the second stage, a medium-setting to slow-setting type of chemical is used to permeate and inject into the smaller voids of sandy soil that contains a significant amount of medium to well-compacted sand layers and cohesive soil, achieving a solid consolidation of the ground. Once the specified injection amount for one stage is reached, the process moves to the next stage, and after all stages are completed, the chemical solution is replaced with water to fill the injection holes while withdrawing the rod. *For more details, please refer to the related link page or feel free to contact us.*

  • Ground improvement
  • Ground foundation construction method
  • Medicines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] SEP Method

Introducing the state of the trial construction! We have included photos of the excavation conditions after the installation of the columnar reinforcement body.

This document introduces the "SEP Method" that our company is implementing. It includes photographs and explanations of the "excavation conditions after the construction of the columnar reinforcement" and "confirmation of the conditions after the excavation of the columnar reinforcement." Additionally, it provides an overview, applications, and features of the "Simple Eco Soda." We encourage you to read it. [Contents] ■ Excavation conditions after the construction of the columnar reinforcement ■ Confirmation of conditions after the excavation of the columnar reinforcement ■ Simple Eco Soda - Product overview/applications - Product features - Precautions for use *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground warranty

A system for paying construction costs to restore the current state! A 20-year warranty will be provided.

Our company is a registered business for the "Ground Guarantee" warranty system. Properties for which we conduct ground surveys and ground improvement work will come with a 20-year warranty. Please feel free to contact us when you need our services. 【Features】 ■ A system that pays for the construction costs to restore the current condition ■ The warranty period starts from the foundation construction date and lasts for 20 years from the delivery date *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[To Ground Improvement Construction Companies] Information on the SEP Method

Securing profits while achieving high-spec foundational ground! Development of pile-type ground reinforcement methods.

We would like to introduce our "SEP Method." By using a screw with a drum attached, we can suppress construction soil discharge. There is less sludge after replacement, which reduces industrial waste disposal costs. Additionally, since there are four patterns of reinforcement body diameters, we can select the size of heavy machinery according to the site, making it possible to accommodate both narrow and large sites. 【Features】 ■ Eliminates waste ■ Not limited by soil type ■ Large pile diameter and wide pile spacing ■ High molding accuracy ■ Shortened construction period *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Laundry Factory: Filling Work for Loose Ground Under Machinery Foundation

Injecting polyurethane under the foundation to eliminate ground looseness! Solved in just one day!

We would like to introduce a case of "filling work for loosening under the machine foundation and urethane filling work inside the pit" conducted at a laundry factory in Kanagawa Prefecture. Due to the loosening of the ground under the machine foundation, the dewatering machine tilted, so we performed filling work to inject urethane under the machine foundation to resolve the ground loosening. Additionally, we carried out work to fill urethane inside the pit where the dewatering machine is installed to prevent further subsidence. After the construction, we conducted a filling confirmation using a CCD camera and confirmed that the urethane was evenly filled under the machine foundation. [Case Overview] ■ Construction Area: 10m² ■ Construction Period: 1 day ■ Area: Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Overview of the A&S construction method

Low cost, shortened construction period! Apply compressive force to weak ground to increase strength.

The "A&S Method" is a consolidation dewatering method that adds embankment to the ground improvement method "SKK Method," which enhances the groundwater recovery capacity. Since the ground that has been finely cavitated through vacuum vaporization experiences minimal settlement on its own, compressed air is sent to the sand layer surface using a large compressor, generating buoyancy pressure. The step-type Qin-TAKO compresses the cohesive soil directly and uniformly. By reducing the water content ratio through air blowing and subsequently applying vacuum vaporization, compression settlement is achieved through atmospheric pressure and embankment weight. The reduction in water content ratio and compression settlement leads to an increase in ground strength. 【Features】 ■ Low cost ■ Shortened construction period (approximately 3 months) ■ No restrictions on construction speed during embankment *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Ground Support Strengthening Injection Work for a Pool at a Certain Embassy

Introduction of construction examples of pool ground support reinforcement injection work.

The RC pool has a length of 25m and a depth of 2m to 4m, with uneven loading. It is believed to have settled due to water leakage from the circulation piping. Additionally, the ground around the leakage area has loosened, causing the southeast corner to settle locally and deform. The plan was to perform overall support strength enhancement injection to stabilize the entire subsoil of the pool from an uneven state to a stable, uniform state, rather than partial repairs to stop further settlement. As a result, the entire structure was lifted by several millimeters, and at the same time, the deformation and inclination were repaired, allowing it to be restored to its original condition. [Case Overview] ■ Location: Tokyo ■ Building Name: 25m ■ Structure and Scale: 25m pool (H2000 to H4000) ■ Foundation Structure: Slab foundation ■ Total Restoration Weight: Approximately 650t *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Renovation and repair methods
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multi-slide method

Installation method for products at sites where large vehicles and heavy machinery cannot enter.

【NETIS CB-060014-A】 This is a construction method for installing secondary products such as box culverts, free gradient ditches, and L-shaped retaining walls in mountainous areas and urban areas where large vehicles and heavy machinery cannot enter. It involves installing rails (steel materials) and steel balls, over which products mounted on sleds (steel materials) slide. Manual installation is also possible depending on the weight of the products.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Uniform thickness soil-cement continuous wall TRD method

Thickened Soil-Cement Continuous Wall TRD Method

The TRD method (Trench cutting & Re-mixing Deep wall method) involves moving a cutter installed underground horizontally to excavate, mixing and stirring the solidifying liquid with in-situ soil in a vertical direction, and creating a wall-like solidified body underground. 【Features】 ○ Outstanding stability ○ Continuous without discrepancies ○ Homogeneous wall quality in depth direction ○ Arbitrary setting of core material spacing is possible ○ Deep construction is possible ○ High-precision construction is possible ○ Construction on slopes is possible ○ Construction with low headroom is possible ○ Cost reduction achieved through shortened construction period ● For more details on other functionalities, please contact us.

  • Steel structure construction
  • Foundation construction
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Proposal for improvement technology of embankment materials utilizing construction-generated soil.

Significantly contributes to shortening construction periods and reducing costs! We have a track record of over 3 million m³ of construction nationwide.

We will introduce the "Improvement Technology for Embankment Materials Utilizing Construction Excavated Soil." Our company proposes a manufacturing technology for embankment materials through particle size improvement using construction excavated soil, which significantly contributes to shortening construction periods and reducing costs by employing a stabilizer. Additionally, by equipping the stabilizer with GNSS, operators can confirm the construction position and monitor the mixing situation in real-time. Furthermore, since the construction records are digitized, it leads to a reduction in construction management through the output of reports after completion. 【Construction Cycle】 1. Transporting soil and creating the improvement yard 2. Primary mixing 3. Adjustment (after primary mixing) 4. Secondary mixing 5. Transporting improved soil 6. Reusing construction excavated soil as embankment material *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Superflow Method

Introducing high fluidity filling mortar suitable for filling narrow spaces and long-distance pumping.

The "Super Flow Method" is a high fluidity filling mortar that does not undergo volume change (reduction). The bleeding rate is low, at 1-2%. It also has a small heat of hydration and boasts extremely high fluidity. Please use it for filling narrow spaces and long-distance pumping. 【Features】 ■ Extremely high fluidity ■ No volume change (reduction) ■ Low bleeding rate of 1-2% ■ Small heat of hydration *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration