Fixes Product List and Ranking from 5 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Sep 09, 2026~Oct 06, 2026
This ranking is based on the number of page views on our site.

Fixes Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 09, 2026~Oct 06, 2026
This ranking is based on the number of page views on our site.

  1. ジオテック Tokyo//Other construction industries
  2. アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡 Kanagawa//others
  3. null/null
  4. 4 null/null
  5. 5 イガサキセキュア Osaka//Service Industry

Fixes Product ranking

Last Updated: Aggregation Period:Sep 09, 2026~Oct 06, 2026
This ranking is based on the number of page views on our site.

  1. Quickly correct the tilts, steps, and gaps in school facility floors using the Upcon method. アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
  2. Settlement correction work | Correction of settlement cracks in the mat foundation using SWS survey and partial jacking. ジオテック
  3. 【Warehouse/Factory】Correcting floor tilt, unevenness, and voids under the floor in as little as one day. アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
  4. Settlement correction work|Clarifying foundation settlement cracks through SWS investigation and partial jack correction. ジオテック
  5. Settlement correction work | Identification of localized settlement due to buried debris! Jacking up correction of the pressure-resistant slab. ジオテック

Fixes Product List

1~18 item / All 18 items

Displayed results

Floor deflection correction (up-construction method)

We will correct the floor deflection in a short time without interrupting your business operations.

【Correction of Floor Deflection in Upcon】 For existing concrete floors that have experienced settlement, unevenness, tilting, or gaps, small holes with a diameter of 16mm are drilled, and polyurethane resin is injected while continuously monitoring the level in millimeter increments. The resin injected beneath the floor expands rapidly under pressure, compacting and reinforcing the ground, improving bearing capacity, and pushing the concrete back to a level position. With a compressive strength of over 36.3 tons/m², it is suitable for warehouses storing large machinery and heavy loads. We have numerous successful cases in precision machinery factories, semiconductor factories, metal processing factories, automotive parts factories, paper warehouses, logistics centers, supermarkets, home improvement stores, electronics stores, convenience stores, and more!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct the tilts, steps, and gaps in school facility floors using the Upcon method.

The Upcon method quickly corrects floor deformations in classrooms, gymnasiums, and poolside areas caused by earthquakes and ground subsidence through polyurethane resin injection.

■There is a sense of discomfort when entering the classroom. ■The floor is slanted, posing a risk of injury or worsening health. ■The slanted floor causes the desks to wobble. ■Windows and doors are difficult to close. ■The gym floor is warped. ■The gym stage is distorted. ■Puddles form by the poolside. The "Upcon Method," which uses polyurethane resin, quickly resolves issues caused by floor slanting and warping due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electronic Delivery Agency] SXF File Conversion CAD Data Modification Service

The SXF conversion work will be carried out responsibly by a holder of the CALS/EC instructor qualification. If you are having trouble with electronic submissions, please consult us.

A CALS/EC professional will handle and support all tasks related to electronic delivery. 【We respond to such 'troubles'】 ○ Original data size exceeds 25MB ○ Number of layers exceeds 220 ○ Blocks are nested multiple times ○ All elements are in layer 0 ○ Numerical values such as length dimensions are changing *You can view the price list via download.

  • Drawing, tracing, CAD
  • Architectural CAD
  • Civil Engineering CAD
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Balance measurement/correction

Our unique balance adjustment! We carry out balance correction work utilizing our extensive experience and knowledge.

Our company utilizes its extensive experience and knowledge to perform "balance correction work." All testing machines, except for the "FH-824," are belt-driven. (Standard specification testing machines use coupling-driven joints.) However, couplings can surprisingly introduce significant measurement errors. In fact, when the coupling is rotated 180°, what was supposed to be corrected below the allowable value may actually exceed it. In the case of belt drive, the belt is directly applied to the test specimen, resulting in zero error. There is no need to prepare a separate coupling, allowing for highly accurate measurements. 【Features】 - All our testing machines, except for the "FH-824," are belt-driven. - All testing machines are equipped with connection terminals for "FFT analyzers." - Correction work involving heat (such as welding) is continuously monitored with a thermal camera. - All correction data is stored in a database. - A record is created for each item and stored in the database. *For more details, please refer to the PDF document or feel free to contact us.

  • Other measuring instruments
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Modification of Strong Earthquake Observation Communication Program

If you have any questions regarding the maintenance, data collection, or data analysis of the strong motion seismometer, please feel free to contact us!

We would like to introduce the "Strong Earthquake Observation Communication Program Modification." We have implemented a function to communicate with AccuSEIS Omni (manufactured by Katsushima Seisakusho) to download self-diagnosis and recorded waveforms. Our company is developing communication software. If you have any questions regarding the maintenance, data collection, or data analysis of strong motion seismometers, please feel free to contact us. 【Overview】 ■ Site Name: Earthquake Disaster Prevention Research ■ Client: National Institute for Land and Infrastructure Management, Ministry of Land, Infrastructure, Transport and Tourism *For more details, please download the PDF or feel free to contact us.

  • ?強震観測通信プログラム修正 画像2.png
  • Other measuring instruments
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Correction of settlement cracks in the mat foundation using SWS survey and partial jacking.

The SWS survey scientifically clarifies partial settlement and cracks in the fabric foundation! We will safely restore it with partial jack adjustments that do not stop the lifelines and steel pipe pile driving.

This construction method is a subsidence correction solution for single-family homes that have experienced partial sinking of the foundation or structural cracks. It scientifically investigates the causes based on SWS (Screw Weight Penetration) tests and high-precision level measurements, allowing for partial jacking up while maintaining the living infrastructure. By implementing flexible piping measures that do not disrupt lifelines such as city gas and water supply and drainage, we achieve complete construction while residents remain in their homes, without the need for temporary housing or relocation. For cracks in the foundation caused by uneven subsidence, we apply structural repairs such as epoxy resin injection, and during lifting, we use small hydraulic jacks and laser measuring devices to safely and precisely restore levelness to the millimeter. Furthermore, by combining the driving of steel pipe piles into the supporting ground and the installation of pressure-resistant slabs, we fundamentally eliminate the risk of future re-subsidence. We dramatically reduce the financial and mental burden on homeowners while ensuring the safety of their homes and enhancing property value, so you can trust us to handle it with confidence.

  • Renovation and repair methods
  • Residential foundations
  • Other earthworks, foundation works, and exterior floors
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submersion Correction Work | Investigation of Foundation Cracks and Epoxy Pressure Plate Correction through SWS Survey

Investigating the causes of basic cracking and partial subsidence through SWS surveys! Achieving cost-effective repairs with minimal waste by combining epoxy resin injection and pressure-resistant slab methods.

This is a low-cost, high-precision subsidence correction method that repairs building subsidence accompanied by foundation cracks without waste, based on scientific diagnosis through SWS (Screw Weight Penetration) testing and precise level measurement. It accurately analyzes ground resistance values and the distribution of weak layers at multiple points within the site to investigate the true causes of subsidence. For the foundation structure damaged by subsidence stress, high-viscosity epoxy resin is pressure-injected to seal and repair cracks, restoring bending strength and seismic resistance to levels exceeding those of new construction. In the lifting process, pressure plates are concentrated under the foundation in the subsidence area, and small hydraulic jacks are linked with high-precision laser measuring devices to carry out millimeter-level precise leveling adjustments. After jacking up, high-density air-mortar (air milk) is injected into the gap between the foundation and the ground to densify it, preventing future risks of re-subsidence. Since it can be constructed with minimal excavation and partial jacking adjustments, it does not incur excessive construction costs and safely and reliably resolves tilting issues in a short period while residents remain in the building.

  • Renovation and repair methods
  • Residential foundations
  • Other earthworks, foundation works, and exterior floors
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Identification of localized settlement due to buried debris! Jacking up correction of the pressure-resistant slab.

Precise investigation of localized subsidence of buried waste hidden in the gaps of survey points! Complete restoration of structural safety of the building through pressure plate jacking and high-viscosity resin injection.

Buried waste such as rubble and construction debris lurking in the gaps of ground investigation data can cause irregular ground softening due to aging and uneven load distribution, leading to significant localized subsidence where only parts of a building sink. Since representative point data from tests like SWS cannot capture this, sudden structural cracks or dangerous deformations may occur at specific locations of the shallow foundation. At Geotech, we conduct hand auger drilling and pinpoint subsurface exploration to accurately visualize the location and extent of buried waste as objective numerical data. In the repair process, we apply a space-saving jack-up method using pressure plates, synchronously driving small hydraulic jacks with the building's own weight as a reaction force, and performing precise horizontal adjustments in millimeter increments under constant high-precision laser monitoring. After the lift-up is completed, we inject high-flow air-entrained mortar (air milk) into the voids created under the floor to equalize the ground pressure over the area, while also pressurizing and sealing high-adhesion epoxy resin into the damaged shallow foundation structure to restore its integrity and structural strength beyond that of when it was newly built. Through Geotech's advanced subsidence correction construction menu, we establish lasting structural safety at the foundation level.

  • Renovation and repair methods
  • Residential foundations
  • Other earthworks, foundation works, and exterior floors
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Warehouse/Factory】Correcting floor tilt, unevenness, and voids under the floor in as little as one day.

【Factory/Warehouse】Correcting the tilt of concrete floors and voids beneath the floor caused by ground subsidence in as little as one day without stopping operations! Patented unique method!

■The cargo in the warehouse is not stacked straight. ■There are level differences that hinder the movement of forklifts. ■The equipment, such as racks, is tilted. ■Abnormal operation is observed in the automatic racks. ■The transport robot has stopped. ■The machine cannot be leveled. Issues caused by floor tilting, level differences, and sagging due to earthquakes or ground subsidence, as well as voids under the floor, can be resolved using a patented unique method called the "Upcon Method," which utilizes polyurethane resin and can correct these problems in as little as one day. 【What is the Upcon Method?】 Polyurethane resin is injected into existing concrete floors that have subsided, and through the pressure of rapid foaming, the ground is compacted and strengthened while pushing up and correcting the concrete floor. Since the correction is done without demolishing the existing concrete floor, it significantly reduces the construction period. The polyurethane can lift the floor with a foaming pressure of up to 10t/m², eliminating the need to move heavy equipment or products. Therefore, corrections can be made without stopping the operations of factories or warehouses. ▼We will be exhibiting at the 【International Logistics Comprehensive Exhibition 2024】. Date: September 10 (Tuesday) to 13 (Friday), 2024 Venue: Tokyo Big Sight, East Exhibition Hall Booth Number: 7-808

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work|Clarifying foundation settlement cracks through SWS investigation and partial jack correction.

Scientifically clarify the partial subsidence and cracks in the foundation through SWS investigation! We will accurately correct and reinforce it while living in the space using partial jacking and steel pipe pile insertion.

This construction method is a groundbreaking settlement correction solution for single-family homes that have experienced partial sinking of the foundation or structural cracks. It scientifically identifies the causes based on SWS (Screw Weight Penetration) tests and precise building level measurements, followed by partial jacking and ground reinforcement. For localized tilting caused by weak ground or uneven consolidation of fill, we use small hydraulic jacks and high-precision laser measurement devices to safely and reliably restore the level to within millimeters. Cracked areas of the foundation are repaired with epoxy resin injection and U-cut seals, and, if necessary, we optimally combine steel pipe pile driving methods and pressure slab methods to fundamentally eliminate the risk of future settlement. Our method fully accommodates construction while residents are living in the home, without the need for moving or temporary housing, allowing work to proceed while maintaining the residents' daily routines. We significantly reduce the financial and mental burden on homeowners, ensuring structural integrity and enhancing long-term asset value, so you can rest assured.

  • Renovation and repair methods
  • Residential foundations
  • Other earthworks, foundation works, and exterior floors
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work|Partial jack correction of settlement cracks in the fabric foundation through SWS investigation.

Accurate clarification of partial subsidence and cracks in the foundation through SWS investigation! We will safely restore it by reducing costs with efficient jack adjustments.

This proposal is a settlement correction method that effectively repairs partial subsidence and cracking issues in strip foundations without incurring excessive construction costs. By conducting a preliminary SWS (Screw Weight Insertion) test, we can pinpoint the specific soft layers or subsidence areas causing the settlement. By applying a "partial jack-up method" that selectively lifts and corrects only the necessary areas without jacking up the entire building, we minimize construction equipment and personnel, achieving significant cost reductions. Furthermore, for structural cracks in the foundation, we combine high-viscosity epoxy resin injection and carbon fiber sheet reinforcement to significantly enhance the durability and toughness of the foundation structure beyond the level of new construction. If necessary, we will implement deep pile driving or pressure slab methods to completely contain the risk of future settlement recurrence. This method is chosen by many contractors and clients as a rational option that balances smart cost management with reliable safety structures and the preservation of the building's asset value.

  • Renovation and repair methods
  • Residential foundations
  • Other earthworks, foundation works, and exterior floors
  • Fixes

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration