Water Supply Construction "Milling Mall Method" Case Study Collection
We will introduce a case study of water supply construction that involves finely cutting and removing underground obstacles!
This document is a collection of case studies on water supply construction by Yasuda Engineering Co., Ltd. The underground obstacle-responsive mud-based thrusting method "Milling Mole Method," equipped with four special functions: "exploration, improvement, cutting, and guidance," consists of three devices: a tunneling machine, a special expandable pipe, and a special injection pipe, allowing for the precise cutting and removal of underground obstacles. We have completed requests from customers using this method. [Featured Cases] ■ Installation of water supply main around Hanjin-cho, Sasebo City, Nagasaki Prefecture (No. 6) ■ New installation of water supply main (500mm) and replacement of water supply main (600mm) from Nishidai 2-chome to Nishidai 1-chome in Itabashi Ward, Tokyo ■ Improvement work on the Shinjo trunk line (Higashiyodogawa 3) 700mm water supply pipe (installation of 1000mm water supply pipe) and others *For more details, please refer to the PDF document or feel free to contact us.
- Company:ヤスダエンジニアリング
- Price:Other