Construction method Product List and Ranking from 1598 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

4096~4110 item / All 4238 items

Displayed results

Ground improvement "Super Ruffle Elneed Method" *Shortened construction period and cost reduction

[Presentation materials being distributed] Expanding partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation! Over 3,000 construction achievements nationwide.

The "Super Rappuru Elneed Method" is a construction technique that uses stabilized soil created by adding water and cement-based solidifying agents to on-site excavated soil, achieving "shortened construction periods" and "lower costs" compared to the Rappuru method. We are expanding our partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation, and we have over 3,000 construction achievements nationwide. 【Do you have any of these concerns?】 ■ The Rappuru method (ready-mixed concrete placement) involves many processes such as excavation and formwork arrangement; is there a method that can be simplified further? ■ Ground improvement work is often based on estimation and experience; is there a method that allows for thorough visual confirmation? ■ Can we ensure quality while minimizing variability even in rainy conditions or at sites where groundwater is surfacing? 【Features of the Super Rappuru Elneed Method】 ■ Shortened construction periods and lower costs ■ Easy confirmation of support layers and high quality ■ Minimal residual soil after construction *For more details, please download the catalog or feel free to contact us.

  • スクリーンショット 2025-04-14 15.27.36.png
  • スクリーンショット 2025-04-14 15.34.39.png
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kanagawa Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site development at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saitama Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido construction method." Since it is constructed using direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site preparation at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Chiba Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of over-excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kanto region! Super Rappu Elniido method.

[NETIS Registration] Achieving shorter construction periods and lower costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukuoka Prefecture! Super Rappu Elniido method.

【NETIS Registration】 Capable of addressing problematic ground issues such as "cost reduction," "shortened construction period," "groundwater emergence," and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 某中学校.jpg
  • 施工図.jpg
  • 地盤改良工事.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 試験室.jpg
  • 水中養生.jpg
  • 試験練り.JPG
  • 試験機.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 01基礎工法?.JPG
  • 造成後天端写真(雨天時).jpg
  • スーパーラップルエルニード工法サブTOP.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagasaki Prefecture! Super Rappu Elniido method.

[NETIS Registration] Nagasaki Prefecture, which is compatible with the construction method! Achieving shortened construction periods and low costs! The Super Rappu El Nido method, which is expected to have particular advantages in remote islands.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Through trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality embankments with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality embankments ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 使用機材.jpg
  • 01基礎工法?.JPG
  • 造成後天端写真(雨天時).jpg
  • スラリー系.....JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 試験室.jpg
  • 圧縮試験機.jpg
  • 土質分析.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagoshima Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieve "shortened construction periods" and "cost reduction" for problematic ground such as "groundwater" and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal surplus soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 20250304-090259-421_fa031358dec5b3af4dd3eff7171cc927.jpg
  • 20250303-134915-152_41e6cf94732c4cc8d04ad32a5998fe33.jpg
  • 20250304-101633-263_2f992ddb37860d4488961a1733823f83.jpg
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験室.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method.

[NETIS Registration] Super Rappu El Nido method, which is expected to have significant cost advantages, especially in remote islands such as Okinawa, Ishigaki Island, and Miyako Island!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions on various ground types, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality site preparation with minimal variation in strength. [Features] - Easy confirmation of the support layer - Shortened construction period and high-quality site preparation - Minimal excess soil on site (amount of disposal soil) - Capable of appropriately responding to the unique ground conditions of Okinawa - Can handle sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 沖縄ブレーカー使用.jpg
  • 巨岩撤去.jpg
  • 支持層.jpg
  • フロー値.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kyushu and Okinawa regions! Super Ruple El Nido method.

[NETIS Registration] Achieving low cost and shortened construction period! Utilizing the advantages of the construction method to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappu Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-101454-365_b6007c0ba031c1820bebdcbb3e6d570e.jpg
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • 造成完了.jpg
  • フロー値写真.png
  • 現場コア写真.JPG
  • コア養生.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof renovation method "Unique Roof Fit" <Contributes to electricity cost savings>

Renovation methods applicable to various roofs! Demonstrating thermal insulation performance + waterproofing performance.

"Unique Roof Fit" is a roofing renovation method that contributes to saving electricity costs. Based on the current state of the existing roof, it is custom-made, and insulation materials are processed and delivered according to the shape of the roof. It uses three types of extruded polystyrene foam insulation equivalent to bA, with a thermal conductivity of 0.028 W/(m·K) or lower, and offers insulation thicknesses of 50, 75, and 100 mm, allowing for proposals based on the customer's required performance. [Features] ■ Fits the shape of the roof ■ Fits indoor heat countermeasures ■ Fits leak prevention measures *For more details, please download the PDF or feel free to contact us.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earthquake measures for factories and warehouses! Consistent support for seismic measures without stopping operations.

Are your factory and warehouse earthquake measures in place? We provide comprehensive support from on-site surveys to seismic assessments and reinforcement construction! We propose safe and secure seismic reinforcement.

■I want to conduct a seismic diagnosis, but I don't know where to request it. ■I am considering BCP measures. ■I want to take effective measures without incurring too much cost. ■I don't want to stop operations due to reinforcement work. Do you have these concerns regarding earthquake measures for factories and warehouses? At Senkushia, we provide comprehensive seismic support from on-site surveys to seismic diagnosis, seismic reinforcement design, and seismic reinforcement construction! We achieve safe and secure seismic reinforcement without stopping the operations of factories and warehouses. 【Senkushia's Original "Steel Frame Seismic Reinforcement System"】 ■Smart Wixis Method: A bolted connection method for reinforcing existing H-shaped steel columns (weak axis direction) with braces. ■Smart Boxis Method: A bolted connection method for reinforcing existing H-shaped steel columns (in both weak and strong axis directions) with braces. ■Smart Attach Method: A non-welding method that shortens construction time and reduces total costs. ■Smart Fit Method: Allows for compact reinforcement with smaller height dimensions of reinforcement materials. ■Smart Chronos II Method: Reduces fire risk with a non-welding method. Achieves shortened construction time and total cost reduction. *You can immediately check the details, benefits, and features of each method in the PDF download section!

  • 01.JPG
  • 02.JPG
  • スマートクロノス?.png
  • 04.JPG
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic retrofitting of existing equipment [Measures for old equipment]

Various stays and anchors have been added, with a proven track record in Aichi Prefecture, Okazaki City.

Safety measures for existing equipment that can only be implemented due to expertise in automation design and manufacturing. Do you have any of these concerns? - Earthquake resistance measures are needed for old machinery, but nothing has been done. - Unsure of where to prioritize. - Due to the age of the machinery, there are no parts or drawings available. We will provide optimal proposals for such concerns. Even for equipment without drawings, we will meet on-site to confirm the direction and respond accordingly. Please consult with us at least once.

  • Conveyor

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Control rust with rust" - Measures against water pipe deterioration!

With the "Piping Magnetite Method," achieve low costs, short construction periods, and a higher level of water environment!

By installing a BW system utilizing the piping magnetite method in the water supply piping, the water quality will change, and the red rust inside the pipes will begin to transform into black rust. Black rust is a crystalline form closer to metal, with a density ten times higher than that of red rust, which improves the blockage rate within the pipes. Additionally, areas where the wall thickness has thinned to the point of almost leaking will be repaired by the black rust. This method can also be applied to drainage pipes. Please feel free to contact us for on-site surveys or estimates. *We are currently providing a comparison with other methods and case studies in PDF format. *For more details, please download the PDF or contact us. *The section titled 'What sparked your interest?' displayed during the PDF download is generated by Ipros Co., Ltd.'s AI.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration