[Construction Example] Construction without moving the rack: Warehouse subsidence correction (Fukushima Prefecture)
No need to remove heavy racks or machinery! Here is a case where modifications were completed in just 4 days.
We would like to introduce a case of settlement correction implemented at a warehouse in Fukushima Prefecture. Due to the effects of the Great East Japan Earthquake that occurred in 2011, gradual settlement progressed over the years. After a few years, floor sagging and tilting began to occur inside the warehouse, and inclinations also developed in the rack installation areas. This caused issues such as the forklift forks not fitting properly, leading to "longer loading and unloading times," which disrupted operations and caused difficulties. In this project, we adopted the Upcon method, which allows for construction without moving heavy racks in a short construction period. We were able to correct an area of approximately 1,250 m² in just four days (with a maximum settlement of about 78 mm). [Case Overview] - Construction Area: Approximately 1,250 m² - Maximum Settlement: 78 mm - Location: Warehouse in Fukushima Prefecture - Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other