Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 HDD method (induced horizontal drilling) achieves shortened construction time and labor savings! 東洋工務店

Construction method Product List

3961~3975 item / All 4219 items

Displayed results

Two-Way Lining Method

The maximum bending angle of the bend pipe can be constructed up to 90°! Large diameter and long-distance construction are also possible.

The "Two-Way Lining Method" is a technology for rehabilitating aging pipelines safely and quickly without excavation. It is compatible with seismic levels 1 and 2, and the maximum bending angle of the bend pipe can be constructed up to 90°. Additionally, by using hot water, it allows for uniform curing without inconsistencies, resulting in high-quality rehabilitation, and significantly improves flow capacity due to enhanced roughness coefficients. 【Features】 ■ Structural design tailored to the purpose of water supply and drainage, agricultural and industrial water pipelines, etc. ■ Compatible with seismic levels 1 and 2 ■ Maximum bending angle of the bend pipe can be constructed up to 90° ■ Capable of large diameter and long-distance construction ■ High-quality rehabilitation possible due to uniform curing with hot water *For more details, please download the PDF or feel free to contact us.

  • Pipeline Construction
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Precast concrete residual formwork method

Ensuring safety in underwater construction and the ability to plan offshore construction, which is easily affected by weather and sea conditions, is possible!

The "Precast Concrete Residual Formwork Method" is a technique that utilizes precast concrete formwork as part of the structure to efficiently and safely implement underwater concrete "belly work" for maintaining, improving, or enhancing the performance of existing facilities such as gravity-type berthing structures (quays and wharves) made of concrete. This method allows for phased construction underwater, offering advantages in terms of shortened construction periods and safety. Additionally, by using precast concrete residual formwork as a method for extending the lifespan of fishing port facilities, it addresses the challenges associated with traditional underwater construction, contributing to improved construction efficiency and worker safety as a standard method. 【Features】 - Requires less workspace since large-scale formwork assembly and post-construction removal work on land are unnecessary. - Reduces the width of the belly work of the structure, thereby decreasing the amount of underwater concrete required. - Enables a reduction in construction time. *For more details, please download the PDF or feel free to contact us.*

  • Renovation and repair methods
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multi-mole method

Sewer main and connection pipe work with limitless functionality! Vertical and horizontal connections are extremely easy and speedy.

The "Multi-Mole Method" is a technique developed by Sato Iron Works that mechanizes horizontal pushing and vertical excavation using "TonTon-kun" and "BuruBuru-kun." In addition to standalone use, it also allows for the joining of horizontal and vertical sections. This method significantly improves labor efficiency, safety, and construction quality. Please feel free to contact us if you have any inquiries. 【TonTon-kun Features】 ■ More cost-effective than conventional pushing methods ■ Capable of construction at one location per day ■ Strong against gravel-mixed ground due to impact pushing ■ Can be pushed from an open-cut trench (effective width of 900mm) *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Scaffolding Method "GS System"

A groundbreaking system born from the needs of the field!

The "GS System" is a highly functional new scaffolding method that achieves GOOD SAFETY. Its structure, which has fewer clamps, allows for safe and speedy work. Scaffolding can be assembled easily, creating a faster and more comfortable working environment. Additionally, it is possible to lay panels seamlessly not only on straight beams but also on curved beams and pot beams. 【Features】 ■ Safe and speedy work due to a structure with fewer clamps ■ Compatible with conventional equipment and methods, thus improving work efficiency ■ Flexible adaptation to curved beams and pot beams, allowing for both panel assembly and disassembly *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Existing tunnel backfill injection method "NEW Set Form NF Method"

The NEW Set Form NF method is a construction technique that offers excellent safety during installation, as well as preventing volume shrinkage of the foam after filling, making it a "safe," "reliable," and "high-performance" method!

The "NEW Set Form NF Method" is a backfill injection method that fills the voids behind the lining concrete in repair work for existing tunnels using a rigid foam polyurethane called "Set Form." It was newly registered with the Ministry of Land, Infrastructure, Transport and Tourism's New Technology (NETIS) in December 2024 (KT-240144-A). 【Features of the NEW Set Form NF Method】 - Over 1,000 successful cases using 40 times expanded polyurethane. - Responsible construction system supported by more than 30 member companies. - The average increase rate of final injection volume is 132%, making it economical. - Uses HFO (hydrofluoroolefin) as a foaming agent, an environmentally friendly non-fluorine product. - Improved dimensional stability due to HFO remaining stable within the foam. - Possesses isocyanurate bonds and uses HFO as a foaming agent, achieving high thermal decomposition temperature and low internal temperature to prevent smoking accidents. - Compact injection equipment eliminates the need for wide access routes or land. - Can be operated with batteries, making it suitable for narrow construction sites. *For more details, please download the PDF or feel free to contact us.

  • Reinforcement and repair materials
  • Tunnel Materials
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry protection method for waterproof rising parts

A method born from viewing many of the issues faced by traditional methods from a new perspective!

I will introduce the "Waterproof Vertical Upstand Dry Protection Method" that we handle in this meeting. This is a systematized method that primarily uses high-strength extruded cement boards and other materials with excellent weather resistance and waterproofing properties to protect the waterproof layer of vertical upstands on rooftops. By systematizing the components, we have achieved many benefits, such as shortening construction periods, facilitating maintenance of the waterproof layer, and improving aesthetic quality. 【Features】 ■ Clarification of functions and required performance ■ Rationalization of construction ■ Insulation between the movement of the pressure layer and the waterproof layer ■ Response to inspections and maintenance repairs *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior wall composite renovation method

It is also possible to create a highly transparent composite layer using transparent resin, while preserving the design of the existing tile surface!

This method is applied to the renovation of deteriorated mortar-finished exterior walls and tile-finished exterior walls. It is a renovation method that uses polymer cement-based coatings along with fiber nets or transparent resin-based paints and anchor pins, and is also referred to as the pin-net method. By combining anchor pins and fiber nets while keeping the existing exterior finishing layer intact, it ensures safety against peeling by preventing the finishing layer from falling off with the anchor pins and integrating the existing finishing layer with the fiber nets. 【Business (Partial)】 ■ Research, development, and improvement of this method ■ Investigation, verification, and evaluation of this method ■ Promotion of this method ■ Education and guidance related to construction techniques and construction management techniques ■ Planning, drafting, operation, and implementation of various study groups, training sessions, and site visits *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ARUR Method: A Long-Life Technology for Asbestos-Containing Slate Roofs

Maintenance-free for 30 years, enabling the long lifespan of factories! This construction method has excellent cost performance and features waterproofing and heat insulation functions.

The "ARUR (Asbestos Roof Urea Renewal) method" is a system that achieves long lifespan and maintenance-free protection for asbestos-containing slate roofs over a period of 30 years. To achieve this, we used advanced one-component reaction-curing urea resin paint. By applying the one-component reaction-curing urea resin paint as a topcoat, a coating with an expected lifespan of 30 years is formed. Additionally, it is an environmentally considerate system that prevents the release of asbestos into the external environment during the process. 【Features】 ■ It becomes maintenance-free for 30 years, allowing for the long lifespan of the factory. ■ A cost-effective method that possesses waterproofing and heat insulation functions. ■ Environmentally considerate asbestos treatment prevents issues with neighboring residents. *For more details, please download the PDF or feel free to contact us.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pressure-resistant plate construction method

One of the construction methods to consider when a hard ground is located at a shallow depth!

The "pressure-resistant plate method" is a technique for correcting the sinking of buildings by installing a pressure-resistant plate under the foundation and lifting it with a jack. It can be used in narrow spaces, and it allows residents to continue their daily lives during construction. This is one of the methods considered when a hard ground is located at a shallow depth. Please feel free to contact our company when you need assistance. 【Main Benefits】 ■ Can be used in narrow spaces ■ Allows normal living during construction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Side pinning method

Just like underpinning, adjust the building's level with hydraulic jacks!

We would like to introduce our proposed "Side Pinning Method." This method involves driving piles into the ground around the foundation's perimeter using a pile driver, and inserting steel pipes until reaching a hard and stable ground. The building is supported by brackets. Similar to under-pinning, the building's level is adjusted using hydraulic jacks. 【Main Benefits】 ■ Construction is possible even if further settlement is expected ■ Can be implemented in narrow spaces ■ Normal living can continue during construction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earthquake measures for factories and warehouses! Consistent support for seismic measures without stopping operations.

Are your factory and warehouse earthquake measures in place? We provide comprehensive support from on-site surveys to seismic assessments and reinforcement construction! We propose safe and secure seismic reinforcement.

■I want to conduct a seismic diagnosis, but I don't know where to request it. ■I am considering BCP measures. ■I want to take effective measures without incurring too much cost. ■I don't want to stop operations due to reinforcement work. Do you have these concerns regarding earthquake measures for factories and warehouses? At Senkushia, we provide comprehensive seismic support from on-site surveys to seismic diagnosis, seismic reinforcement design, and seismic reinforcement construction! We achieve safe and secure seismic reinforcement without stopping the operations of factories and warehouses. 【Senkushia's Original "Steel Frame Seismic Reinforcement System"】 ■Smart Wixis Method: A bolted connection method for reinforcing existing H-shaped steel columns (weak axis direction) with braces. ■Smart Boxis Method: A bolted connection method for reinforcing existing H-shaped steel columns (in both weak and strong axis directions) with braces. ■Smart Attach Method: A non-welding method that shortens construction time and reduces total costs. ■Smart Fit Method: Allows for compact reinforcement with smaller height dimensions of reinforcement materials. ■Smart Chronos II Method: Reduces fire risk with a non-welding method. Achieves shortened construction time and total cost reduction. *You can immediately check the details, benefits, and features of each method in the PDF download section!

  • 01.JPG
  • 02.JPG
  • スマートクロノス?.png
  • 04.JPG
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Cutting Report】HORN S45C Processing Case: Comparison of Chip Formation with Different Breakers

Conducting a comparison test for cutting edge processing! Please refer to this if you are having trouble with chip disposal.

The material being machined this time is S45C, and we performed interrupted cutting using three different types of HORN breakers to compare chip removal. As additional information, we also measured not only the chips but also the arithmetic average roughness Ra (μm) and the maximum height of the profile Pt (μm). The machining was done under the same conditions, with an insert width of 2.0 mm, a cutting speed of 180 m/min, a constant peripheral speed, and a feed rate of 0.08 mm/rev for comparison. Each breaker has different characteristics, and you should be able to see the differences in the chips. *For detailed content of the column, please refer to the related link. For more information, feel free to contact us.

  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic retrofitting of existing equipment [Measures for old equipment]

Various stays and anchors have been added, with a proven track record in Aichi Prefecture, Okazaki City.

Safety measures for existing equipment that can only be implemented due to expertise in automation design and manufacturing. Do you have any of these concerns? - Earthquake resistance measures are needed for old machinery, but nothing has been done. - Unsure of where to prioritize. - Due to the age of the machinery, there are no parts or drawings available. We will provide optimal proposals for such concerns. Even for equipment without drawings, we will meet on-site to confirm the direction and respond accordingly. Please consult with us at least once.

  • Conveyor

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Short-term Correction: Certain Food Warehouse Void Filling Work

Upcon construction method using rigid polyurethane foam! Introducing a case where a cavity was corrected in three days.

We would like to introduce a case of "void filling work" conducted at a certain food warehouse in Kanagawa Prefecture. Using the Upcon method, which allows for the filling of voids that developed under the floor with polyurethane resin in a short period, we corrected a maximum void of 270mm (with a construction area of approximately 171m2) in just three days. After the resin filling, we checked the filling condition with a CCD camera and used non-shrink mortar to seal the injection holes. 【Case Overview】 ■ Construction Area: Approximately 171m2 ■ Maximum Void Size: 270mm ■ Location: A certain food warehouse in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration