Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Stretchable Joint Repair Method "Ex Relife Method"

Construction method Product List

3196~3210 item / All 4212 items

Displayed results

Special Friction Support Method "MRX Method"

A method for supporting low-rise buildings on weak ground.

The "MRX Method" is a special friction support method that excavates and mixes the ground in a polygonal shape, integrating soil cement and piles, allowing for extremely high bearing capacity compared to existing methods. By achieving high bearing capacity, construction costs for buildings can be reduced. Additionally, due to its low vibration and low noise characteristics, it is a method that takes into consideration urban areas and surrounding environments. 【Features】 ■ Can accommodate various ground conditions ■ Provides high lateral friction force ■ Easy construction management ■ Generates little waste soil ■ Minimal impact on surrounding environments ■ Compatible with conventional round piles *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wooden construction method "APS method"

A new wooden construction method that is resistant to earthquakes and fires.

The APS construction method is a wooden building technique that minimizes cross-sectional defects while preserving the beauty and precision of traditional joints and timber framing. By incorporating specialized hardware, it enhances the strength of the joints. This advanced method combines the advantages of hardware construction with the benefits of traditional techniques, excelling in both cost and design. 【Features】 ■ Earthquake resistance ■ Fire resistance and airtightness ■ Aesthetic appeal *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Housing structure technology/long-term superior housing technology
  • Systems Architecture

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Simple earth retention method for excavation.

The relocation of the excavation area due to construction is quick, so the construction period in residential areas is shorter.

We would like to introduce the "Simple Earth Retention Method for Excavation." In this method, we carry out the work while confirming the excavation in areas that have traditionally been extremely difficult, such as gravel layers. Therefore, when there are boulders, cobbles, or obstacles, it becomes easy to either remove them or proceed with the excavation while embedding them. Additionally, the machinery used consists only of an excavator and a crane truck, with no other heavy equipment or materials required. 【Features】 ■ Each component is designed with safety calculations and a soft composite structure. ■ The interior of the excavation allows for wider and safer work. ■ The movement of the excavation area due to construction is quick. ■ The construction period in residential areas is shorter. ■ Each component can be disassembled and transported by a regular truck. *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case: Ceiling Heat Insulation Work at Mr. S's Residence

Excellent thermal insulation even in the winter cold, and we've solved the condensation problem! Here is an example of heat insulation work in the attic.

We would like to introduce a case study of the ceiling heat insulation work requested by Mr. S. Due to the aging of the home, we received a request for a high-durability total renovation. In response, we introduced the patented heat insulation material "Top Heat Barrier" and installed it over the insulation in the attic during the roof replacement. "After the installation, we requested it with the hope that it would make things a little easier during the renovation, and I am surprised by how much cooler this summer has been than expected. The insulation effect in winter is excellent, and the condensation that had troubled us every year has disappeared, allowing us to live comfortably," we received this feedback. [Customer's Request] ■ High-durability total renovation due to the aging of the home *For more details, please refer to the PDF document or feel free to contact us.

  • Heat insulation and heat shielding methods
  • Heat shielding sheet
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TDR shot lining system method (mortar wet spraying method)

Corresponds to various sharp curves! A construction method for clients who want to reduce costs or shorten construction time.

The "TDR Shot Lining System Method" is a secondary lining construction system for shield steel segment sections. It responds to needs such as "wanting to fill steel segments in shield tunnels with sharp curves," "wanting to shorten construction time," and "wanting to increase construction speed." By introducing this method, it can accommodate sharp curve sections that are difficult to construct with conventional methods, and it can fill various areas of steel segments, achieving high density. 【Benefits of Implementation】 ■ Achieved approximately 1.7 times construction progress - T Construction Co. ■ Able to handle sharp curve sections that are difficult to construct with conventional methods ■ Can fill various areas of steel segments, resulting in high density *For more details, please refer to the related links or feel free to contact us.

  • Renovation and repair methods
  • Civil Engineering Method
  • Tunnel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Surface collapse prevention method for slopes: "Steel root installation method"

A method to preserve the topsoil without cutting down trees using "iron roots"!

The "Steel Root Installation Method" is a rapid, economical, and environmentally friendly slope surface stabilization technique. Forest vegetation spreads strong root systems like a net across the soil layers of the mountainside, gripping the surface soil as if various sizes of piles have been driven in. Additionally, it is important to eliminate water pressure to prevent excessive pore water pressure that could lead to slope failure. The land conservation functions of these forest root systems are complemented and reinforced by the "steel roots." [Features] ■ Binding effect ■ Water absorption effect (reduction of pore water pressure) ■ Pile effect *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Metal construction method "DURA-JOINT"

It is also possible to finish beautifully when used for decorative beams! Durable housing hardware that can withstand long-term use.

"DURA-JOINT" is a hardware method that can be used not only with laminated wood but also with "domestic solid wood." The round tenon on the back of the hardware has a "jaw support effect" that supports the beam, demonstrating high resistance to "tensile," "shear," and "reverse shear (uplift from below)" loads. With its unique chrome-free rust prevention treatment "Dural Coat," it also offers long-term durability, contributing to the effective use of domestic wood and consideration for the environment in housing. 【Features】 ■ High precision ■ Effective use of domestic wood ■ Durable housing hardware ■ Compatible not only with laminated wood but also with "cedar lumber products" ■ Standard adoption of chrome-free rust prevention treatment "Dural Coat" *For more details, please refer to the PDF materials or feel free to contact us.

  • Fittings and fittings work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Earth Drill Type Enlarged Base Pile Method "SY Method"

A cast-in-place concrete enlarged base pile method that allows for a fivefold increase in bearing capacity even in narrow sites.

The "SY Method" is a new cast-in-place concrete enlarged base pile method that achieves a large bearing capacity by excavating the enlarged base diameter to more than twice the shaft diameter. With a mechanical bucket, it is possible to construct enlarged base piles with five times the bearing capacity even in narrow sites. It also accommodates high-strength concrete with a design standard strength of up to 45 N/mm². 【Features】 ■ Maximum enlarged base diameter φ4700mm ■ 4.84 times high bearing capacity ■ Suitable for narrow sites ■ Compatible with all casing ■ Reliable construction management *For more details, please download the PDF or contact us.

  • Earthworks
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Full rotary cast-in-place concrete pile enlarged base method (GSB method)

The maximum base diameter is 3000mm, and a maximum slope angle of 12 degrees can be constructed. The excavated soil can be recycled as general surplus soil.

This technology is a full-casing enlarged pile construction method that can build enlarged piles in soft rock and medium-hard rock support layers. An enlarged excavation device called the GSB bucket is attached to the tip of the casing of a general-purpose full-rotation drilling machine, and the bottom of the hole is enlarged using the rotational torque of the full-rotation drilling machine and the hydraulic telescopic arm of the GSB bucket. Since the amount of casing penetration and the extension of the arm can be managed in 1 cm increments, it allows for the construction of inclined sections with a maximum inclination angle of 12 degrees. 【Features】 ■ Enlarged excavation can be performed in very hard rock ■ Minimal pile core deviation and high vertical accuracy ■ Simple equipment for enlarged excavation ■ Adaptable to changing ground conditions ■ Capable of handling underground obstacles within a series of drilling processes *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the seismic reinforcement method "RB Method"

A seismic reinforcement method that bonds brace materials to existing frameworks by releasing prestress.

At Daiwa Corporation, we offer the seismic reinforcement method "RB Method," which allows braces to be pressure-bonded to existing frameworks using self-adhesive force, making relocation possible. By utilizing the rebound force of the disc springs installed at the ends of the braces, we pressure-bond and integrate the braces with the existing structure, thereby enhancing the seismic performance of the existing building. 【Features】 ■ Reinforcement while occupied ■ Shortened construction period ■ Cost reduction ■ Safe, as no welding or gas flames are used during construction *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method
  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large-scale precast prefabricated retaining wall method "Super Wall Method"

Maximize land use! A retaining wall method that supplies high-quality products.

The "Super Wall Method" is a construction technique that allows for the height of the wall to be freely adjusted by combining five types of blocks, making it easy to construct high retaining walls. Compared to conventional retaining walls, the assembly work is simpler and does not require skilled labor, making construction management easier and speeding up the project. Additionally, positioning pins are used at the joints between blocks to ensure smooth alignment during installation. 【Features】 ■ Excellent workability ■ High rigidity ■ Cost-effective ■ Promotes labor-saving *For more details, please download the PDF or feel free to contact us.

  • Concrete Retaining Wall
  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Rebuilding the factory without extinguishing the "big pot" fire.

Construction method that does not stop factory operations" Naruse Steel Industry Co., Ltd. "Separate Method

The "Separate Construction Method" is a technique that allows for rebuilding without completely demolishing existing buildings. Instead of new construction after total demolition, it divides the construction period into two phases, enabling the replacement to be carried out while maintaining operations even in densely populated areas where expanding the building space is not possible. In this construction plan, based on the request to switch from the old large furnace to the new one without stopping the operation of the large furnace, a new large furnace was established on the first phase construction side to take over operations from the old large furnace. Additionally, to avoid waste during future factory expansions, the building on the second phase construction side is designed to be suspended from the structural framework of the first phase construction side. This also contributes to reducing the factory's life cycle costs. 【Construction Targets】 ■ There is relocation space on adjacent land. ■ There is no room around the existing building. ■ It is possible to plan the production line across upper and lower floors. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Raised the building by 6 meters to expand the lifting height of the crane inside the factory.

Construction method that does not stop factory operations" Electric Industry Co., Ltd. Kawagoe Factory "Lift-Up Method

The "Lift-Up Method" is a construction technique that raises a building while maintaining seismic strength without dismantling the existing factory structure. In this project, we received a request to increase the crane lifting height due to the aging of the existing traveling crane. First, we conducted an investigation of the seismic resistance and strength of the existing building to confirm its current seismic resistance and strength. We determined that with reinforcement, it could withstand the elevation. During construction, we connected the columns of the raised portion to the existing column tops to enhance strength, and then, using the cover build method, we installed a new roof and walls before dismantling the existing roof from the inside. As a result, the crane lifting height was increased, contributing to improved work efficiency. 【Construction Targets】 ■ There are documents such as drawings and structural calculation sheets. ■ The foundation of the existing building has sufficient strength. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory Reconstruction Method "Separate Method" [Achieving Reconstruction Without Stopping the Line]

Are you giving up on rebuilding a factory because there is no space around the existing building? It is possible to rebuild in two phases without stopping the production line!

The "Separate Construction Method" is a technique where instead of completely demolishing an existing building and then constructing a new one, the construction period is divided into two phases, allowing for the rebuilding to take place while maintaining operations. First, machinery is moved to the second phase side, and construction begins on the first phase side. After the first phase is completed, the machinery is moved back from the second phase side to the first phase side. By completing the second phase afterward, the factory can operate at full capacity without disruption. [Recommended for such factories!] ■ There is relocation space in the adjacent area ■ There is no room around the existing building ■ It is possible to plan the production line across different floors *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cover Build Method

A typical construction method of "rebuilding while operating"! The roof and exterior walls are installed first.

The "Cover Build Method" is one of the representative construction methods of Yoshizawa Architectural Structural Design, made possible by precise structural calculations, allowing for "reconstruction while in operation." Machines and equipment within the factory that cannot be moved are left in place, while a steel frame is assembled over the existing factory, with the roof and exterior walls installed first. After ensuring that rain and wind do not enter, the existing buildings within the new structure are gradually dismantled while the reconstruction proceeds. 【Features】 ■ Made possible by precise structural calculations ■ New buildings are constructed to cover the existing ones ■ Machines and equipment that cannot be moved within the factory are left as they are *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration