List of Civil Engineering Method products
- classification:Civil Engineering Method
121~135 item / All 817 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Correction during nighttime while business is suspended! A case of correcting floor sag due to ground subsidence in a short construction period.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Adopting the up-con method for short-term intensive repairs! Construction carried out with compatibility for multiple plant vehicles.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Upcon construction method using rigid polyurethane foam! Introducing a case where a cavity was corrected in three days.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Due to the impact of the China-Vietnam earthquake, part of the floor inside the store has sunk! Case study of subsidence correction work at the game center.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
No need to remove heavy racks or machinery! Here is a case where modifications were completed in just 4 days.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Floor subsidence due to weak ground! Introducing a case where repairs were made during nighttime while the business was closed.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Due to the impact of the Great East Japan Earthquake, the floor inside the store sank! A case where repairs were made during the night while the store was closed.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Due to the impact of the Great East Japan Earthquake, subsidence! Adjusted 350m2 with four consecutive nights of construction.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Floor sagging due to ground subsidence! A case of straightening the floor before store renovation.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk! There have been cases where gaps have formed between the floor and the walls, as well as betwee...
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Settlement due to compaction: Significant sinking of the floor inside the store due to the impact of the Great East Japan Earthquake! We will introduce our response case.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Due to consolidation settlement, the floor has sunk extensively within the store! A gap has occurred between the floor and the wall.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Significant damage from the Great East Japan Earthquake! Introducing a case of subsidence correction with a maximum subsidence of 112mm.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Implementing with sufficient attention to noise! Introducing examples of work carried out at night during business closure.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
A significant subsidence of the floor due to weak ground! Introducing a case where corrections were made at night during the business closure.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method