iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36363items
    • Facilities
      Facilities
      56858items
    • Lighting and Interior
      Lighting and Interior
      17426items
    • Common materials
      Common materials
      37322items
    • Civil Engineering Materials
      Civil Engineering Materials
      9907items
    • Construction, work and methods
      Construction, work and methods
      28365items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29666items
    • IT/Software
      IT/Software
      36804items
    • others
      others
      79920items
    • Store and facility supplies
      Store and facility supplies
      4518items
    • Office and commercial supplies
      Office and commercial supplies
      11639items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      996items
    • Logistics Equipment
      Logistics Equipment
      7085items
    • Energy and Resources
      Energy and Resources
      11850items
  • Search for companies by industry

    • Information and Communications
      7321
    • others
      7167
    • Building materials, supplies and fixtures manufacturers
      6582
    • Service Industry
      4689
    • Trading company/Wholesale
      3009
    • Other construction industries
      2430
    • Electrical equipment construction business
      639
    • Interior Design
      520
    • Facility Design Office
      490
    • Construction Consultant
      461
    • retail
      361
    • Architectural design office
      358
    • Warehousing and transport related industries
      324
    • Electricity, Gas and Water Industry
      288
    • General contractors and subcontractors
      280
    • Interior construction business
      277
    • Medical and Welfare
      275
    • Educational and Research Institutions
      256
    • Building Management
      251
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      203
    • Housing manufacturers and construction companies
      182
    • Transportation
      158
    • Real Estate Developers
      156
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      65
    • Finance, securities and insurance
      38
    • Restaurants and accommodations
      30
    • self-employed
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • retail
  • Architectural design office
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Renovation and repair methods
  6. [Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

[Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:May 23, 2024

アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
  • Official site

Due to the impact of the China-Vietnam earthquake, part of the floor inside the store has sunk! Case study of subsidence correction work at the game center.

We would like to introduce a case where "disaster recovery work" and "floor sinking correction work" were carried out at a game center located along a national highway in Niigata Prefecture. In this case, part of the floor inside the store sank due to the impact of the Chuetsu earthquake. Therefore, the company was requested to correct the sinking because it could be done in a short period of time. The sinking correction was performed using the Upcon method with rigid polyurethane foam. The work was completed in one day. 【Case Overview】 ■ Area of sinking correction: Approximately 83m2 ■ Maximum sinking amount: -77mm ■ Planned correction value: Within 16mm ■ Area: Niigata Prefecture ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

    Renovation and repair methodsCivil Engineering MethodGround foundation construction method
7_1.PNG

[Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

7_1.PNG
7_1.PNG
  • Related Link - https://www.upcon.co.jp/case/6953/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

catalog(7)

Download All Catalogs
Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]

Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Emergency restoration method Dantan

Emergency restoration method Dantan

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

[Residential Edition] Concrete Floor Slab Settlement Correction Method

[Residential Edition] Concrete Floor Slab Settlement Correction Method

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

[Road Section] Concrete Pavement Slab Repair Method

[Road Section] Concrete Pavement Slab Repair Method

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Upcon Co., Ltd. Company Profile

Upcon Co., Ltd. Company Profile

COMPANY
  • E-book viewing
  • Catalog download

Contact this catalog

[Store Edition] Concrete Floor Slab Settlement Correction Method

[Store Edition] Concrete Floor Slab Settlement Correction Method

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

[Factory/Warehouse Edition] Concrete Floor Slab Settlement Correction Method

[Factory/Warehouse Edition] Concrete Floor Slab Settlement Correction Method

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Company information

アップコン

アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡

others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Official site
Phone number/address

We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.

Product/Service List (106)

Popular products in related categories

[Construction Case] Vibration Suppression in Precision Parts Manufacturing Factory - Void Filling Work
Construction, work and methods
[Construction Case] Vibration Suppression in Precision Parts Manufacturing Factory - Void Filling Work
アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
[Construction Example] Precision Parts Factory: Floor Slab Settlement Correction Work
Construction, work and methods
[Construction Example] Precision Parts Factory: Floor Slab Settlement Correction Work
アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
[Construction Case] Parts Assembly Factory: Floor Slab Settlement Correction Work
Construction, work and methods
[Construction Case] Parts Assembly Factory: Floor Slab Settlement Correction Work
アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
[Construction Case] Supermarket: Subfloor Settlement Correction Work (Gifu Prefecture)
Construction, work and methods
[Construction Case] Supermarket: Subfloor Settlement Correction Work (Gifu Prefecture)
アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
[Construction Case] T Printing Company Factory in Miyagi Prefecture
others
[Construction Case] T Printing Company Factory in Miyagi Prefecture
アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡

Related New Products

Soil Coating Method "PoliSoil Greening" <NETIS Registered>
Construction, work and methods
Soil Coating Method "PoliSoil Greening" <NETIS Registered>
丸八土建
"End! Look forward to the next time" Max Company Tube Marker Letter Twin
Facilities
"End! Look forward to the next time" Max Company Tube Marker Letter Twin
日幸電機 仙台営業所
Soil retention material pull-out simultaneous filling GEOTETS method
Construction, work and methods
Soil retention material pull-out simultaneous filling GEOTETS method
Taiyo Kisokogyo Co.,Ltd.
Shortening construction period, repair plan, cost distribution - exterior wall work using rope access methods.
Construction, work and methods
Shortening construction period, repair plan, cost distribution - exterior wall work using rope access methods.
TRAWE main office
Correcting floor irregularities, steps, and undulations that hinder AGV operation to improve operational efficiency.
Logistics Equipment
Correcting floor irregularities, steps, and undulations that hinder AGV operation to improve operational efficiency.
フロアエージェント

The related categories of Renovation and repair methods

  • Construction, work and methods
  • Construction methods and technologies
  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
Find products and companies by related keywords
  • #Repair work
  • #Subsidence correction work
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.