[Construction Example] Supermarket: Subfloor Settlement Correction Work (Chiba Prefecture)
Due to the impact of the Great East Japan Earthquake, the floor inside the store sank! A case where repairs were made during the night while the store was closed.
Here is a case study of "subfloor sinking correction work" conducted at a large supermarket in Chiba Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the store sank significantly. The Upcon method, which can be corrected during the night while the store is closed, was adopted, and our company carried out the correction. Since the store primarily handles fresh food products, we not only used plastic sheets for protection around the injection gun during construction but also enclosed the injectors to prevent resin dispersion while working. 【Case Overview】 ■ Construction Area: Approximately 2,000 m² ■ Maximum Sinking Amount: 99 mm ■ Area: Chiba Prefecture ■ Construction Period: Continuous 9 nights * To expedite the construction period, two construction plant vehicles were utilized (2011). * For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.