[Construction Example] Construction without moving the rack: Warehouse subsidence correction (Fukushima Prefecture)
No need to remove heavy racks or machinery! Here is a case where modifications were completed in just 4 days.
We would like to introduce a case of settlement correction implemented at a warehouse in Fukushima Prefecture. Due to the effects of the Great East Japan Earthquake that occurred in 2011, gradual settlement progressed over the years. After a few years, floor sagging and tilting began to occur inside the warehouse, and inclinations also developed in the rack installation areas. This caused issues such as the forklift forks not fitting properly, leading to "longer loading and unloading times," which disrupted operations and caused difficulties. In this project, we adopted the Upcon method, which allows for construction without moving heavy racks in a short construction period. We were able to correct an area of approximately 1,250 m² in just four days (with a maximum settlement of about 78 mm). [Case Overview] - Construction Area: Approximately 1,250 m² - Maximum Settlement: 78 mm - Location: Warehouse in Fukushima Prefecture - Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.