List of Harbor Construction products
- classification:Harbor Construction
76~90 item / All 122 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
The high unsinkability "monocoque type" and the "separate type" that allows for the selection of appropriate components based on usage.
- Bridge Construction
- Harbor Construction
- Other earthworks, foundation works, and exterior floors
Realizing the effective use of all construction-generated soil! Applicable to the separation and improvement of debris-mixed soil generated by disasters!
- Road construction
- River construction
- Harbor Construction
Selection by single coil contact in a dual coil type magnetic inclinometer.
- Harbor Construction
- Civil Engineering Company
- Other civil engineering services
This is a ground improvement method suitable for liquefaction countermeasures, achieved through extensive infiltration and rapid construction of large-volume soil. The consolidation over 19 years has ...
- Ground improvement
- Foundation construction
- Harbor Construction
[Coastal Technology Research Center Certification: No. 14002] Demonstrated 19 years of aging consolidation through large-scale field injection tests!
- Airport facilities
- Harbor Construction
- Ground improvement
A single-point flow meter ideal for installation on underwater structures and mooring lines. It uses ultrasound to measure flow direction and velocity at remote locations with minimal influence from s...
- Coastal construction
- Harbor Construction
- River construction
A high-speed sampling (up to 64Hz) ultrasonic three-dimensional flow direction and velocity meter that focuses on a single point. It can be used from deep sea depths of 6000m to indoor experimental ta...
- Harbor Construction
- Coastal construction
- River construction
Uncovering the truth behind the reduction of sea ice in the Arctic Ocean!
Research results using Nortek's Aquadopp Profiler (ADCP) and Vector (ADV) have been announced in a press release by the Atmosphere and Ocean Research Institute, University of Tokyo. For more details, please see below: Unraveling the Truth Behind the Decrease of Sea Ice in the Arctic Ocean! — Thorough Investigation of Heat Movements Beneath the Sea Ice at the North Pole — https://www.aori.u-tokyo.ac.jp/research/news/2022/20220823.html#p1
Challenge to the unknown! An underwater camera originally developed for marine research. An underwater camera robot that can withstand harsh environments for management on factory lines!
- Coastal construction
- Harbor Construction
Protecting and ensuring the safety of the marine environment! Introducing various types of fences.
- River construction
- Coastal construction
- Harbor Construction
Point measurement of fine waves - "Servo-type wave height gauge"
- River construction
- Harbor Construction
- Other measuring instruments
NATO-approved shark repellent kit. Used by the United States Navy.
- Coastal construction
- Harbor Construction
- Other civil engineering services
No switching required! Simultaneous output of three-phase four-wire and single-phase three-wire.
- Power generation equipment
- River construction
- Harbor Construction
High efficiency, low noise, compact space natural energy generation!
- Harbor Construction
- Power generation facilities
- Prime movers, torque converters, hydraulic equipment, generators
Numerous construction achievements! Contributing to various marine facilities and waterfront development.
- Harbor Construction
- Coastal construction
- Other earthworks, foundation works, and exterior floors
This is a large barricade used for traffic management on the premises, lane separation in parking lots, and security at events.
- Harbor Construction
- Temporary Construction
- Road construction