List of Bridge Construction products
- classification:Bridge Construction
181~195 item / All 559 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Safety is important, scenery is important, connecting lives! A crane is moving along the bridge to sequentially install it.
- Bridge Construction
I am working with a sense of mission to pass on the value of history to my children and grandchildren!
- Bridge Construction
Monitor the consistency between analysis results and the actual object in real-time! Safe and highly accurate installation.
- Bridge Construction
Replace in a short time! The newly assembled girder on the frame will be moved horizontally and connected!
- Bridge Construction
The removal of the old bridge and the installation of the new bridge will use the cable crane direct hanging method! We will introduce our construction examples.
- Bridge Construction
We take care to keep the appearance as close to the original as possible! With our technology, we will restore that breathtaking view.
- Bridge Construction
Amazing technique achieved in one night! Using special construction machinery such as mobile multi-axis dollies and 240t stage jacks.
- Bridge Construction
- Dismantling and moving
Bridges that do not stop the flow of people, cars, or rivers! Strong against heavy rain and earthquakes, they connect lives and revitalize communities.
- Bridge Construction
A simple structure that opens up to the waterside! We will introduce the collective installation using mobile multi-wheeled carts.
- Bridge Construction
- Road construction
Bright colors that harmonize with the surrounding landscape! A safe and comfortable pedestrian network is spreading.
- Bridge Construction
- Road construction
Adopting a structure that considers maintenance and repairs after use! Connecting to the future with a durable and long-lasting bridge.
- Bridge Construction
A steel arch bridge spanning the first-class river Shōgawa! Introducing a construction example from M.M. Bridge.
- Bridge Construction
An evolved hydraulic tensioner that overcomes the challenges of conventional tensioners, such as "too heavy," "does not fit in narrow spaces," and "oil leakage due to repeated use."
- Foundation construction
- Bridge Construction
- Railway Construction
We will be exhibiting at EE Tohoku '23 starting tomorrow!
Nortlock Japan will exhibit at the exhibition "EE Tohoku '23," aimed at the publicizing and dissemination of new technologies related to the construction industry, on June 7 (Wednesday) - 8 (Thursday) at Yume Messe Miyagi. At this exhibition, we will introduce our representative product, the "Nortlock Washer," which uses the world's first wedge locking mechanism that does not rely on friction, as well as "Super Bolt," "Boltight," and "Expander." On the first day of the event, we will also give a presentation in the "New Technology Presentation" session. (June 7, 14:30-14:45 @ Main Hall B) ■ Exhibition Overview - Dates: June 7, 2023 (Wednesday) 10:00-16:30, June 8 (Thursday) 9:30-16:00 - Venue: Miyagi Industrial Exchange Center, Yume Messe Miyagi - Booth Number: B-084 (Technology field for maintenance management and preventive maintenance) If you plan to attend or are interested, please stop by the Nortlock Japan booth and presentation. We look forward to seeing you!
Flexible linear scale capable of measuring lengths up to 20m.
- Watergate
- Foundation construction
- Bridge Construction
MTS Sensor Technology has obtained ISO 9001 at its Tokyo headquarters and factory.
MTS Sensor Technology Co., Ltd. obtained the international quality management standard ISO 9001 on January 2, 2013, at its Tokyo headquarters and factory (both located at 737 Aihara-cho, Machida City, Tokyo). With this certification and registration, the Tokyo headquarters and factory aim to provide stable products and services to customers in the development, manufacturing, and sales of magnetostrictive linear sensors "Temposonics(R)" and "Level Plus(R)", while engaging in continuous quality improvement activities and striving for further enhancement of customer satisfaction. ■ Quality Management System Registration Details ■ Registration Certificate Number: YKA4004959 Registered Organization Name: MTS Sensor Technology Co., Ltd. (Tokyo Headquarters and Factory) Location: 737 Aihara-cho, Machida City, Tokyo Applicable Standard Number: ISO 9001:2008, JIS Q 9001:2008 Certification Body: Lloyd’s Register Quality Assurance Limited Accreditation Body: Japan Accreditation Board (JAB) Registration Date: January 2, 2013 Validity Period: January 1, 2016
A mechanism that absorbs energy and reduces cross-sectional forces! Applicable to both new bridges and seismic reinforcement of existing bridges.
- Bridge Materials
- Bridge Construction
- Earthquake-resistant construction method