CONOC Construction Industry 94% Reduction in Transcription Work
CONOC Construction Industry Cloud
Reduce transcription time by 94%. With CONOC's AI OCR feature, a 3-hour task is transformed into 10 minutes.
The number one cause of overtime in the construction industry is said to be "data entry work." Receiving preliminary estimates and manually entering each item into Excel or ledgers can take 2 to 3 hours per case, which is not uncommon. For construction companies handling dozens of cases each month, this data entry alone results in the loss of dozens of hours every month. The AI OCR feature of CONOC's construction industry cloud fundamentally solves this problem. By simply taking a photo of the preliminary estimate with a smartphone, an AI specialized for the construction industry automatically digitizes the data. It supports handwritten notes, PDFs, and photos. All that remains is to input the gross profit margin into the content read by the AI, and the estimate is complete. A task that used to take 3 hours can now be finished in 10 minutes, achieving a reduction rate of 94%. There is no longer any need to return to the office to input data. In companies with annual sales of 100 million yen, there are cases where this inefficiency in data entry results in over 4 million yen in gross profit loss annually. *For more details, please download the PDF or feel free to contact CONOC.
Inquire About This Product
basic information
Automatic data digitization of preliminary estimates using only smartphone photography (supports handwritten, PDF, and photos) / 94% reduction in transcription time compared to conventional methods (180 minutes → 10 minutes) / Estimates can be completed on-site without returning to the office / High-precision recognition by AI specialized for the construction industry.
Price information
Monthly fee from 13,000 yen (excluding tax), initial costs are separate.
Price range
P2
Delivery Time
P1
Applications/Examples of results
Reduction of preliminary estimate transcription work and efficiency improvement of estimation tasks for small and medium-sized construction companies.
catalog(1)
Download All CatalogsCompany information
There is a shortage of manpower. As a result, there is also a shortage of time. Right now, such a vicious cycle is occurring in the construction industry. However, I believe that what is most lacking is digitalization. If we can make inefficiencies efficient and create new connections, we can change the common sense of the past and the world itself. We truly believe this. Starting from manufacturing, knowing the field inside and out, and above all, valuing people. That’s why we want to find more ways to make people smile. Can we focus more on things that only people can do? Can we allocate more time to the challenges that we, as a company, should face? We want to continue to ask these questions. Let’s turn the common sense of the construction industry upside down. Now, towards a new future, let’s go together.










![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)
