APLAS Sheet Method for Shortening Construction Periods of Aging Infrastructure Reinforcement
[NETIS Registration] Completion in as little as 1 day, including protective measures. Eliminates the need for unevenness correction processes and reduces on-site construction time by 40%. A high-value reinforcement method that also facilitates upward construction.
The "APLAS Sheet Method" significantly improves construction productivity and addresses on-site challenges through a reinforcement technique. It resolves the long construction periods and complexity of on-site work associated with traditional carbon fiber sheet methods using unique material technology. 【Features】 ■ The dedicated adhesive with leveling correction function eliminates the need for primer processes, drastically reducing the construction period from the conventional 4 days to just 1 day. ■ The paste-like adhesive prevents misalignment, demonstrating high operability even in upward applications such as ceiling surfaces, thereby reducing the burden on workers. ■ Bending and overlapping joints can be easily performed with on-site heating, allowing for flexible and speedy responses to complex structural shapes. ■ Quiet construction that suppresses noise, vibration, and exhaust gas, making it suitable for work in facilities that are operational or in residential areas at night. ■ Lightweight material that can be manually transported, helping to reduce costs associated with heavy machinery and scaffolding, contributing to the overall optimization of construction expenses. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Product Specifications (Partial)】 ■Fiber: PAN-based (High Strength Type) ■Resin: PPS ■Fiber Weight: 200g/m2 ■Product Thickness: 0.25mm ■Design Thickness: 0.111mm ■Width: 250mm *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Achievements】 ■ Road Bridge Deck Reinforcement - Adopted for the reinforcement of deck slabs on aging road bridges - Simplified work processes compared to carbon fiber bonding methods, achieving construction efficiency ■ Station Platform Deck Reinforcement - Enabled daytime construction while trains are running, carrying out reinforcement work on aging platform deck slabs - A new method that eliminates the need for heavy machinery, balancing safety assurance and cost reduction *For more details, please download the PDF or feel free to contact us.
catalog(6)
Download All Catalogs
Company information
Aurostech Technologies LLC is a company engaged in research and development related to plasma surface modification technology, as well as the manufacturing, planning, and sales of products related to these technologies. With a professional team possessing extensive technical expertise and know-how in plasma technology, we have set our mission as "solving adhesion challenges in core industries and enriching people's lives," and we are committed to daily research activities and product development while looking toward the future society. Depending on the combination of plasma treatment conditions and materials, it is possible to maintain high adhesion for an extended period or to achieve direct bonding without adhesives. Additionally, since roll-to-roll processing is possible under a reduced pressure atmosphere, we can achieve both stable processing effects and high productivity.



![[Information] Liquefaction countermeasures using the SST method](https://image.www.ipros.com/public/product/image/c64/2000693898/IPROS95999416432840359919.png?w=280&h=280)

![[Construction Example] Akita Prefecture Port Facility (RTG Running Path) Repair Work Settlement Correction](https://image.www.ipros.com/public/product/image/a81/2001074906/IPROS16826870593465565225.jpg?w=280&h=280)



