[Construction Case] Fabric Formwork "Fabri-Form Disaster Prevention Step"
The disaster prevention steps can be installed at any position in a vertical arrangement, just like stair construction!
We would like to introduce a case study on measures to prevent water surface drop accidents in pond bank protection construction. At this site, after the installation of fabric formwork, there was a problem where the surface of the fabric formwork became slippery due to moss and other growths on the fabric. In response, we proposed the "Fabric Formwork Disaster Prevention Step Method." This allows for the installation of steps made from fabric formwork at any desired location on the bank slope, enabling the construction of emergency disaster prevention steps. 【Case Overview】 ■ Issues - The surface of the fabric formwork became slippery due to moss and other growths on the fabric. ■ Results - Steps made from fabric formwork were installed at any desired location on the bank slope. - Emergency disaster prevention steps were successfully constructed. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
1. Contributing to the harmony between people and the natural environment with outstanding civil engineering technology. 2. Optimally connecting the demand and supply of civil engineering and environmental business. 3. Challenging the creation of new value.