Manufactured and supplied at a JIS-certified factory for concrete secondary products! Significant reduction in construction time!
The "TAKUMINO Floor Slab Method" is a precast RC floor slab method that uses a fixed-body rebar joint. Bridge repairs and renovations can be completed in about one-tenth of the time compared to conventional methods, and it is a NETIS-registered method. By utilizing precasting, there is a significant reduction in on-site workload and working hours, as well as achieving high-quality finishes and planned construction through factory production. 【Features】 ■ Compatible with floor slab replacement work that follows the installation conditions of existing bridges ■ Allows for division of upper and lower lanes and construction in a short period, reducing the impact on users ■ Highly suitable and economical for small to medium-sized bridges managed by local governments ■ Can be handled by local construction companies and concrete product manufacturing plants ■ Developed through joint research between industry and academia, with practical experiments conducted on city-managed bridges for commercialization *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Development Objectives】 ■Countermeasures for bridge aging ■Utilization of local companies ■Response to labor shortages *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Achievements】 ■ Akayama Bridge ■ Sarukoshi Bridge ■ Soto Gasawa No. 1 Bridge ■ Ueno Bridge *For more details, please download the PDF or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company, with the theme of "Harmony between Nature and Humanity," actively engages in national land development and urban planning based on advanced technologies and a diverse range of construction achievements in railway civil engineering, drainage, hydropower plants, soil and water conservation, river disaster prevention, new and improved roads, sewage systems, and bridge repairs. Building on over 135 years of history, knowledge, and experience since our founding, we aim for further growth.