[Construction Case] Office/Parts Warehouse: Settlement Correction Work
No stoppage of operations, correction of subsidence! We present a case where the floor level was corrected and gaps in the walls were improved.
We would like to introduce a case of "settlement repair work" carried out at the office and parts warehouse of an automobile manufacturer located in Hokkaido. Due to the settlement, the building was tilting, causing issues with the opening and closing of doors, and gaps had formed in the ceiling. Therefore, the company adopted the Upcon method, which allows for construction without stopping operations and can be completed in a short time. After the work was completed, the floor levels throughout the office and parts warehouse were corrected, and the gaps in the walls that had existed before the construction were also improved. 【Case Overview】 ■ Construction area: 345m2 ■ Maximum settlement amount: 63mm ■ Maximum gap amount: 70mm ■ Area: Office of an automobile manufacturer located in Hokkaido ■ Construction period: 3 days *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.


![[Construction Case] Elementary School: Floor Settlement Correction Work and Underfloor Void Filling Work](https://image.www.ipros.com/public/product/image/c9b/2001216610/IPROS03883685874845211655.png?w=280&h=280)
![[Construction Case] Elementary School: Correction Work for Sunken Earthen Floor](https://image.www.ipros.com/public/product/image/6eb/2001216619/IPROS30301772314074578041.png?w=280&h=280)
![[Construction Example] Food Factory Second Floor: Settlement Correction Work and Unevenness Correction Work](https://image.www.ipros.com/public/product/image/e92/2001202694/IPROS23111346029452906139.png?w=280&h=280)
![[Construction Case] Vibration Suppression in Precision Parts Manufacturing Factory - Void Filling Work](https://image.www.ipros.com/public/product/image/dce/2000805581/IPROS16201383356472785712.jpeg?w=280&h=280)
![[Construction Example] Large Product Storage Warehouse: Floor Slab Settlement Correction Work / Construction in 2010](https://image.www.ipros.com/public/product/image/e95/2001208466/IPROS38766081695798832917.png?w=280&h=280)



