[Construction Example] Food Processing Plant: Earthquake Recovery Floor Slab Settlement Correction Work
Settlement of the earthen floor caused by the earthquake! Correcting the settled floor before the factory renovation work in a short period of time.
We would like to introduce a case of "floor sinking correction work (earthquake recovery work)" carried out at a food processing factory in Iwate Prefecture. Due to the impact of the Great East Japan Earthquake, extensive renovations were necessary, and to achieve a swift recovery, the Upcon method, which allows for quick corrections, was adopted. The construction area was approximately 1,135 m², with a maximum gap of 221 mm. The construction period was six days, utilizing two construction plant vehicles. [Case Overview] - Construction Area: Approximately 1,135 m² - Maximum Gap: 221 mm - Area: Iwate Prefecture - Construction Period: 6 days (Handled by 2 construction plant vehicles) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.