"Concrete slab sinking correction method" contributes to the longevity of social infrastructure.
Using high-strength urethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and cavities that have occurred in the concrete slab, without excavation and within a short construction period.
The Upcon concrete slab settlement correction method (KT-080008-A, NETIS registration period ended in October 2014) quickly resolves issues such as settlement, unevenness, flapping, gaps, and voids that occur in concrete pavement slabs commonly used in highways and other areas, using specially developed high-strength polyurethane resin. It achieves a short construction period by utilizing a highly mobile plant without breaking the existing pavement slabs or requiring excavation work. This minimizes the period of service suspension and has a proven track record as a planned and efficient method for maintaining social infrastructure. This technology is also adopted not only for highways but also for repair work in ports and airport aprons, as well as disaster recovery work. Upcon will exhibit at the "Highway Techno Fair 2023," where cutting-edge technologies supporting highways will be showcased. Date: November 9 (Thursday) and 10 (Friday), 2023, from 10:00 to 17:00 Location: Tokyo Big Sight, West Hall 3 Exhibition Booth No: A-04 On that day, there will also be a demonstration of settlement correction using polyurethane resin. We invite you to take this opportunity to see it. We look forward to your visit.
Inquire About This Product
basic information
**Characteristics of Concrete Pavement Slab Settlement Correction Method** - **Short Construction Period** Polyurethane resin develops the required strength approximately two hours after injection, allowing for early reopening to traffic. - **Settlement Correction Without Excavation** Unlike conventional methods (concrete replacement), the processes of dismantling, installing, forming, rebar placement, and curing required for concrete pavement slab replacement are unnecessary. - **Improvement of Subgrade Looseness** The polyurethane resin injected beneath the concrete slab expands, filling cavities and voids completely, while also improving the looseness of the surface subgrade. - **Responsive Plant Vehicles** Construction can be carried out simply by placing a construction plant vehicle equipped with all necessary materials within the restricted area. Upcon conducts everything from investigation to construction consistently and responds swiftly, contributing to the longevity and maintenance of road, port, and airport infrastructure.
Price information
Concrete pavement slab Settlement correction Step correction Void filling
Delivery Time
Applications/Examples of results
catalog(10)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
![[Construction Case Study/Port Edition Vol. 1] Port Maintenance Management Work (Quay Restoration) Subsidence Correction and Void Filling](https://image.www.ipros.com/public/catalog/image/01/93a/646469/IPROS7250851689726681210.jpeg?w=120&h=170)
![[Construction Case Study / Port Edition Vol. 2] Onagawa Fishing Port Miyagazaki Quay Disaster Recovery Project](https://image.www.ipros.com/public/catalog/image/01/f20/647656/IPROS5098479422774090087.jpg?w=120&h=170)
![[Construction Case Study/Road Edition Vol. 2] Joban Expressway Nagareyama IC Restoration and Repair Work](https://image.www.ipros.com/public/catalog/image/01/d1a/652747/IPROS13288921954826130650.jpg?w=120&h=170)
![[Construction Case Study/Road Edition Vol. 1] Kanmon Tunnel Concrete Pavement Slab Void Filling Work](https://image.www.ipros.com/public/catalog/image/01/67d/652383/IPROS18287232451842893111.jpg?w=120&h=170)
![[Construction Case Study / Port Edition Vol. 4] Sendai Shiogama Port (Ishinomaki Area) Hibari-no Chuo Pier Quay Disaster Recovery Work](https://image.www.ipros.com/public/catalog/image/01/6e4/734399/IPROS3107554405782613509.jpeg?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.