Quickly correct the factory floor's slope and the gaps under the floor with rigid polyurethane foam resin!
Correct the floor tilt caused by earthquakes or ground subsidence without stopping operations and in a short time! No need to move machines or equipment! Also suppress any concerning vibrations from the machines!
■ The level of the machine cannot be secured. ■ The machine is tilted and vibrating. ■ Malfunctions are occurring in the machine, leading to an increase in defective products. ■ Gaps have formed in the floor, walls, and ceiling. ■ Cracks have appeared in the floor. The "Upcon Method" uses polyurethane resin to quickly correct issues caused by tilting or sagging of the floor, as well as voids or gaps that have formed beneath the floor due to earthquakes or ground subsidence. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor where subsidence has occurred. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and reinforcing the ground, improving bearing capacity, and pushing the concrete back to a level position. The final strength of the resin is achieved in about 60 minutes. Additionally, if voids have formed beneath the floor, they are filled using the same method. By correcting the existing concrete floor without demolition, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or loads. The deformation of the floor is corrected without stopping the production line.
Inquire About This Product
basic information
**Features of the Upcon Method** 1. Short Construction Period: The construction period is 1/10 of traditional methods. Since there is no need to demolish existing concrete floors or wait for curing periods, significant reductions in construction time are achieved compared to traditional methods. 2. No Operational Downtime: No need to move machinery or goods. Construction can be carried out without stopping the production line. 3. High Technical Skill: Responsible construction by 100% in-house employees. Our technical staff, who have received thorough training and gained experience, are responsible for the construction. 4. Compact Construction Setup: Quick restoration of the current state is possible. By placing a construction plant vehicle equipped with all necessary materials near the building entrance, large plant installation and removal are unnecessary. 5. Reduced Risk of Resettlement: The risk of resettlement is lower compared to traditional methods. Polyurethane resin is lighter than concrete or mortar, significantly reducing the risk of resettlement due to the weight of the materials. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. If you are troubled by floor subsidence, please feel free to contact Upcon, the specialists in subsidence correction, with nationwide support and over 3,000 successful cases.
Price range
Delivery Time
Applications/Examples of results
Doma floor sinking correction work Doma floor void filling work
catalog(7)
Download All Catalogs![[Construction Case Study/Factory Edition Vol. 1] Settlement Correction and Void Filling Work for a Bag Manufacturing Factory](https://image.www.ipros.com/public/catalog/image/01/2e3/649428/IPROS09434185074319628739.jpeg?w=120&h=170)
![[Construction Case Study/Factory Edition Vol.2] Settlement Correction and Void Filling Work for Precision Parts Manufacturing Factory](https://image.www.ipros.com/public/catalog/image/01/60a/649429/IPROS31170878921170722761.jpeg?w=120&h=170)
![[Construction Case Study Factory Edition Vol. 3] Correction Work for Sunken Floor Slab in a Metal Processing Factory](https://image.www.ipros.com/public/catalog/image/01/7cc/727508/IPROS94865378217145340721.jpeg?w=120&h=170)
![[Construction Case Study/Warehouse Vol.2] Settlement Correction Work for Automobile Manufacturer's Office and Parts Storage](https://image.www.ipros.com/public/catalog/image/01/d82/644772/IPROS41981554215493828964.png?w=120&h=170)
![[Construction Case Study/Warehouse Vol. 1] Settlement Correction and Void Filling Work for Warehouse and Factory](https://image.www.ipros.com/public/catalog/image/01/d17/644938/IPROS68258418151929232212.jpeg?w=120&h=170)
News about this product(1)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.
The related categories of Vibration isolation, vibration control, and earthquake resistance construction
- Construction, work and methods
- Construction methods and technologies
- Renovation and repair methods
- Surveys, Measurements, and Services
- Surveying, measuring and analysis equipment
- Vibration and Sound Level Meter
- Construction Works
- Vibration isolation, vibration control, and earthquake resistance construction