12/14 Inspection and Analysis Equipment Manufacturer's Personnel Utilization Techniques
This is a seminar focused on the challenges faced by manufacturers of inspection and analysis equipment. It will explain methods for utilizing personnel to maximize their capabilities, taking into account the characteristics of the industry.
■Event■ December 6 (Wednesday) 13:30-14:30 [60 minutes] Online December 14 (Thursday) 13:30-14:30 [60 minutes] Online ■Participation Fee■ Free ■Instructor■ Takeshi Uehara, Consultant, Astec Consulting Co., Ltd. ■Program■ 1. Issues faced by inspection and analysis equipment manufacturers 2. Effectively utilizing personnel through overall workforce management 3. Selecting production methods according to the situation 4. Changing the manufacturing management system ■How to Apply■ Please apply through our company website. https://www.ast-c.co.jp/seminar/technology.html#67
Inquire About This Product
basic information
With the end of the COVID-19 pandemic, there are expectations for an expansion of orders in the future, and many manufacturers of testing and analysis equipment are likely facing an urgent need to establish systems for increased production. However, in today's environment where securing personnel is not easy, it is not a simple task for labor-intensive testing and analysis equipment manufacturers to raise their production capacity. In this seminar, we will explain methods for maximizing the capabilities of the current workforce and how to choose production methods according to production volume to navigate such situations.
Price range
P1
Delivery Time
Applications/Examples of results
Recommended for such workplaces! - I have been in cell production for many years, but I am questioning whether it fits the current situation. - We are holding back on increasing production, but we are not able to gather the necessary personnel as we hoped. - We cannot produce items according to the production plan. - There are many temporary workers and technical interns, and multi-skilling is not progressing. - The coordination between assembly and sub-assembly is poor, causing frequent stoppages in the process.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in manufacturing, such as revenue enhancement, productivity improvement, lead time reduction, and inventory reduction, including the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create customized original programs tailored to each company's management challenges, addressing everything from "on-site improvements" to "system improvements" and "production innovation," and provide appropriate solutions. If you encounter any issues that need to be addressed, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astech Consulting HP] https://www.ast-c.co.jp/