Construction right up against the wall! A case study using the SR-45 multi-drill excavator.
We would like to introduce a case study of underground obstacle removal work that our company has conducted. In Nakano, Tokyo, we carried out underground obstacle removal work right up against the wall, which could not be performed by BG machines or full-rotation excavators. The machine used was the SR-45 multi-drill excavator. We removed underground obstacles such as underground structures, concrete debris, and H-beams. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work at SR-45 Ultra Wall Edge ■ Construction Date: February 14, 2023 ■ Location: Nakano, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.